共 50 条
- [31] DYNAMIC-PROGRAMMING IN OPEN-PIT MINING SEQUENCE PLANNING - A CASE-STUDY 21ST APPLICATION OF THE COMPUTERS AND OPERATIONS RESEARCH IN THE MINERAL INDUSTRY, 1989, : 415 - 422
- [32] A fuzzy DEMATEL based sustainable development index (FDSDI) in open pit mining - a case study RUDARSKO-GEOLOSKO-NAFTNI ZBORNIK, 2020, 35 (01): : 1 - 11
- [37] Geometallurgical Domaining by Cluster Analysis: Iron Ore Deposit Case Study Natural Resources Research, 2019, 28 : 665 - 684
- [38] A simulation algorithm for material flow from open pit mine to power plant: A case study MINE PLANNING AND EQUIPMENT SELECTION 2000, 2000, : 793 - 797