Cost analysis of material handling systems in open pit mining: Case study on an iron ore prefeasibility study

被引:13
|
作者
de Werk, Marco [1 ]
Ozdemir, Burak [1 ]
Ragoub, Bellal [1 ]
Dunbrack, Tyrrell [1 ]
Kumral, Mustafa [1 ]
机构
[1] McGill Univ, Dept Min & Mat Engn, Adams Bldg,Room 119,3450 Univ St, Montreal, PQ H3A 0E8, Canada
来源
ENGINEERING ECONOMIST | 2017年 / 62卷 / 04期
基金
加拿大自然科学与工程研究理事会;
关键词
D O I
10.1080/0013791X.2016.1253810
中图分类号
F [经济];
学科分类号
02 ;
摘要
Selection of the optimal material handling system is one of the most significant decisions to be made in mineral industries. Rapid economic changes and technological improvements make cost analysis a complicated process. On the other hand, current low commodity prices have put a greater emphasis on cost reduction and process optimization to ensure viability of mining projects. In this article, two material handling systems, a semimobile in-pit crusher and conveyor systems (IPCC) and traditional truck and shovel systems (TS), are compared through the cost analysis of an iron ore prefeasibility study. Furthermore, robustness of the design parameters is evaluated through a sensitivity analysis to determine the relative importance of project parameters. Finally, risks associated with uncertain design parameters affecting cost analysis are assessed through Monte Carlo simulation. The results indicated that IPCC is more cost effective than TS.
引用
收藏
页码:369 / 386
页数:18
相关论文
共 50 条
  • [31] DYNAMIC-PROGRAMMING IN OPEN-PIT MINING SEQUENCE PLANNING - A CASE-STUDY
    WRIGHT, EA
    21ST APPLICATION OF THE COMPUTERS AND OPERATIONS RESEARCH IN THE MINERAL INDUSTRY, 1989, : 415 - 422
  • [32] A fuzzy DEMATEL based sustainable development index (FDSDI) in open pit mining - a case study
    Ataei, Mohammad
    Masir, Raziye Norouzi
    RUDARSKO-GEOLOSKO-NAFTNI ZBORNIK, 2020, 35 (01): : 1 - 11
  • [33] Heuristic approximation and computational algorithms for closed networks: A case study in open-pit mining
    Daduna, Hans
    Krenzler, Ruslan
    Ritter, Robert
    Stoyan, Dietrich
    PERFORMANCE EVALUATION, 2018, 119 : 5 - 26
  • [34] A New Mining Scheme for Hanging-Wall Ore-Body during the Transition from Open Pit to Underground Mining: A Numerical Study
    Tan, Baohui
    Ren, Fengyu
    Ning, Youjun
    He, Rongxing
    Zhu, Qiang
    ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [35] Analysis of the Potential for Use of Floating Photovoltaic Systems on Mine Pit Lakes: Case Study at the Ssangyong Open -Pit Limestone Mine in Korea
    Song, Jinyoung
    Choi, Yosoon
    ENERGIES, 2016, 9 (02)
  • [36] Geometallurgical Domaining by Cluster Analysis: Iron Ore Deposit Case Study
    Rajabinasab, Babak
    Asghari, Omid
    NATURAL RESOURCES RESEARCH, 2019, 28 (03) : 665 - 684
  • [37] Geometallurgical Domaining by Cluster Analysis: Iron Ore Deposit Case Study
    Babak Rajabinasab
    Omid Asghari
    Natural Resources Research, 2019, 28 : 665 - 684
  • [38] A simulation algorithm for material flow from open pit mine to power plant: A case study
    Erarslan, K
    MINE PLANNING AND EQUIPMENT SELECTION 2000, 2000, : 793 - 797
  • [39] From a Mining Mindset to Regional Discovery: A Case Study for Hematite Iron Ore Exploration in Mauritania
    De Waele B.
    Aitken A.
    Van Mourik M.
    Laab K.O.
    Med Yeslem M.E.O.
    Mohamedou T.
    Exploration Geophysics, 2019, 2019 (01)
  • [40] Microseismic events for slope stability analysis - a case study at an open pit mine
    Luo, X.
    Salvoni, M.
    Dight, P.
    Duan, J.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2018, 118 (03) : 205 - 210