共 50 条
- [1] Scheduling in iron ore open-pit mining [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 72 (5-8): : 1021 - 1037
- [2] Scheduling in iron ore open-pit mining [J]. The International Journal of Advanced Manufacturing Technology, 2014, 72 : 1021 - 1037
- [4] Application of ARENA Simulation Software for Evaluation of Open Pit Mining Transportation Systems - A Case Study [J]. PROCEEDINGS OF THE 12TH INTERNATIONAL SYMPOSIUM CONTINUOUS SURFACE MINING - AACHEN 2014, 2015, : 213 - 224
- [6] Transition from open-pit to underground in the case of Chah-Gaz iron ore combined mining [J]. Journal of Mining Science, 2013, 49 : 955 - 966
- [7] Mining fleet effectiveness - A large open pit mine case study [J]. Fifth Large Open Pit Conference: HARNESSING TECHNOLOGY BY MANAGING DATA AND INFORMATION, 2003, 2003 (07): : 127 - 131
- [8] Ultimate pit slope design at Saniem iron ore mine, Goa: A case study [J]. 1600, Taru Publications (61): : 9 - 10
- [9] Cadia east open pit project mining study [J]. 6TH LARGE OPEN PIT MINING CONFERENCE 2007, 2007, 2007 (08): : 37 - 44
- [10] Study of Slope Stability (Open Pit Mining, Algeria) [J]. SOIL TESTING, SOIL STABILITY AND GROUND IMPROVEMENT, 2018, : 1 - 11