Evolutionary programming-based multiarea economic dispatch with tie line constraints

被引:48
|
作者
Jayabarthi, T [1 ]
Sadasivam, G
Ramachandran, V
机构
[1] Vellore Engn Coll, Dept Elect & Elect Engn, Vellore 632014, Tamil Nadu, India
[2] Anna Univ, Sch Elect & Elect Engn, Chennai 25, India
[3] Anna Univ, Sch Engn & Comp Sci, Chennai 25, India
来源
ELECTRIC MACHINES AND POWER SYSTEMS | 2000年 / 28卷 / 12期
关键词
D O I
10.1080/073135600449044
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents a new approach to include tie line constraints in multiarea economic dispatch problems by using evolutionary programming (EP). The proposed method always finds the global or near global optimum for small and reasonable-sized multiarea economic dispatch (MAED) problems. The inclusion of tie line constraints to MAED does not introduce any complexity in the approach. The applicability and validity of the proposed method is shown by implementing it on three example systems-2, 4, and 14 areas-and their results are compared with those obtained by classical economic dispatch, network flow programming, and dynamic programming methods, respectively The results show that the proposed method can serve as a potential tool for solving MAED problems.
引用
收藏
页码:1165 / 1176
页数:12
相关论文
共 50 条
  • [21] Fuzzy Mutated Evolutionary Programming based algorithm for combined economic and emission dispatch
    Prasanna, T. S.
    Somasundaram, P.
    [J]. 2008 IEEE REGION 10 CONFERENCE: TENCON 2008, VOLS 1-4, 2008, : 546 - 550
  • [22] Evolutionary-programming-based algorithm for environmentally-constrained economic dispatch
    Wong, KP
    Yuryevich, J
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1998, 13 (02) : 301 - 306
  • [23] Evolutionary programming based economic power dispatch solutions with independent power producers
    Padhy, NP
    Kumari, L
    [J]. PROCEEDINGS OF THE 2004 IEEE INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION, RESTRUCTURING AND POWER TECHNOLOGIES, VOLS 1 AND 2, 2004, : 172 - 177
  • [24] Stochastic programming-based bounding of expected production costs for multiarea electric power systems
    Hobbs, BF
    Ji, YD
    [J]. OPERATIONS RESEARCH, 1999, 47 (06) : 836 - 848
  • [25] Real-time economic dispatch with line flow and emission constraints using quadratic programming
    Fan, JY
    Zhang, L
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1998, 13 (02) : 320 - 325
  • [26] Evolutionary programming-based goal-attainment method for economic emission load dispatch with non-smooth fuel cost and emission level functions
    Basu, M.
    [J]. Journal of the Institution of Engineers (India): Electrical Engineering Division, 2005, 86 (SEPT.): : 95 - 99
  • [27] Two-dimensional evolutionary programming-based CLEAN
    Choi, IS
    Kim, HT
    [J]. IEEE TRANSACTIONS ON AEROSPACE AND ELECTRONIC SYSTEMS, 2003, 39 (01) : 373 - 382
  • [28] A clustering algorithm using an evolutionary programming-based approach
    Sarkar, M
    Yegnanarayana, B
    Khemani, D
    [J]. PATTERN RECOGNITION LETTERS, 1997, 18 (10) : 975 - 986
  • [29] One-dimensional evolutionary programming-based CLEAN
    Choi, IS
    Kim, HT
    [J]. ELECTRONICS LETTERS, 2001, 37 (06) : 400 - 401
  • [30] Evolutionary programming techniques for different kinds of economic dispatch problems
    Jayabarathi, T
    Jayaprakash, K
    Jeyakumar, DN
    Raghunathan, T
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2005, 73 (02) : 169 - 176