Application of PSO algorithm in short-term optimization of reservoir operation

被引:34
|
作者
SaberChenari, Kazein [1 ]
Abghari, Hirad [2 ]
Tabari, Hossein [3 ]
机构
[1] Gorgan Univ Agr Sci & Nat Resources, Dept Watershed Management Engn, Fac Nat Resources, Gorgan, Iran
[2] Urmia Univ, Fac Nat Resources, Dept Range & Watershed Management, Orumiyeh, Iran
[3] Katholieke Univ Leuven, Hydraul Div, Dept Civil Engn, Leuven, Belgium
关键词
Reservoir operation; Particle swarm optimization; Mahabad dam; Iran; PSO model; PARTICLE SWARM OPTIMIZATION; WATER-SUPPLY OPERATIONS; DESIGN; NETWORKS; DROUGHT;
D O I
10.1007/s10661-016-5689-1
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The optimization of the operation of existing water systems such as dams is very important for water resource planning and management especially in arid and semi-arid lands. Due to budget and operational water resource limitations and environmental problems, the operation optimization is gradually replaced by new systems. The operation optimization of water systems is a complex, nonlinear, multi-constraint, and multidimensional problem that needs robust techniques. In this article, the practical swarm optimization (PSO) was adopted for solving the operation problem of multipurpose Mahabad reservoir dam in the northwest of Iran. The desired result or target function is to minimize the difference between downstream monthly demand and release. The method was applied with considering the reduction probabilities of inflow for the four scenarios of normal and drought conditions. The results showed that in most of the scenarios for normal and drought conditions, released water obtained by the PSO model was equal to downstream demand and also, the reservoir volume was reducing for the probabilities of inflow. The PSO model revealed a good performance to minimize the reservoir water loss, and this operation policy can be an appropriate policy in the drought condition for the reservoir.
引用
收藏
页数:11
相关论文
共 50 条
  • [41] Optimization of short-term hydropower scheduling with dynamic reservoir capacity based on improved genetic algorithm and parallel computing
    Zhang, Rongqi
    Zhang, Shanghong
    Wen, Xiaoxiong
    Yue, Ziqi
    Zhou, Yang
    JOURNAL OF HYDROLOGY, 2024, 636
  • [42] Integrating long- and short-term reservoir operation models via stochastic and deterministic optimization: Case study in Japan
    Celeste, Alcigeimes Batista
    Suzuki, Koichi
    Kadota, Akihiro
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2008, 134 (05) : 440 - 448
  • [43] A grasshopper optimization algorithm for optimal short-term hydrothermal scheduling
    Zeng, Xie
    Hammid, Ali Thaeer
    Kumar, Nallapaneni Manoj
    Subramaniam, Umashankar
    Almakhles, Dhafer J.
    ENERGY REPORTS, 2021, 7 : 314 - 323
  • [44] An Improved Chimp Optimization Algorithm for Short-term Hydrothermal Scheduling
    Chen, Gonggui
    Wang, Shumin
    He, Yongsheng
    Shang, Wanfeng
    Long, Hongyu
    IAENG International Journal of Computer Science, 2022, 49 (03):
  • [45] Fast Genetic Algorithm for Long Short-Term Memory Optimization
    Girsang, Abba Suganda
    Tanjung, Daniel
    ENGINEERING LETTERS, 2022, 30 (02)
  • [46] Gravitational Search Algorithm Optimization for Short-term Hydrothermal Scheduling
    Bhattacharya, Aniruddha
    Bhattacharya, A.
    Datta, Shatadru
    Basu, Meheli
    2012 INTERNATIONAL CONFERENCE ON EMERGING TRENDS IN ELECTRICAL ENGINEERING AND ENERGY MANAGEMENT (ICETEEEM - 2012), 2012,
  • [47] Short-term load and spinning reserve prediction based on LSTM and ANFIS with PSO algorithm
    Ferdosian, Mohammad
    Abdi, Hamdi
    Karimi, Shahram
    Kharrati, Saeed
    JOURNAL OF ENGINEERING-JOE, 2024, 2024 (03):
  • [48] Research on short-term load forecasting based on feature similarity using PSO algorithm
    Wei Xinquan
    Zheng Weiyan
    Duan Xiangjun
    2020 4TH INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2020), 2020, 510
  • [49] Optimization of PSO-BP neural network for short-term wind power prediction
    Power Dispatching Control Center Guangdong Power Grid Co., Ltd., No.55 Pazhou Avenue, Haizhu District, Guangdong, Guangzhou
    510000, China
    不详
    510640, China
    不详
    510640, China
    Int. J. Low Carbon Technol., (2687-2692):
  • [50] Optimal short-term operation of a multipurpose reservoir system under limited water supply
    Cancelliere, A
    Giuliano, G
    Nicolosi, V
    Rossi, G
    WATER RESOURCES SYSTEMS-HYDROLOGICAL RISK, MANAGEMENT AND DEVELOPMENT, 2003, (281): : 200 - 207