共 50 条
- [41] Rolling strategy and optimization algorithm for dynamic no-wait flow shop scheduling problem Kongzhi yu Juece/Control and Decision, 2009, 24 (04): : 481 - 487
- [42] Metaheuristics for Two-stage No-Wait Flexible Flow Shop Scheduling Problem 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT (IEOM), 2015,
- [43] A hybrid iterated greedy algorithm for the distributed no-wait flow shop scheduling problem 2017 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2017, : 9 - 16
- [44] An Enhanced Migrating Birds Optimization Algorithm for No-wait Flow Shop Scheduling Problem PROCEEDINGS OF THE 2013 IEEE SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE IN SCHEDULING (CISCHED), 2013, : 9 - 13
- [45] ACO-LS Algorithm for Solving No-wait Flow Shop Scheduling Problem INTELLIGENCE IN THE ERA OF BIG DATA, ICSIIT 2015, 2015, 516 : 89 - 97
- [47] A High Quality Solution Constructive Heuristic for No-Wait Flow Shop Scheduling Problem INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2016, 15 (03): : 206 - 214
- [49] No-wait flow shop scheduling with large lot sizes Annals of Operations Research, 1997, 70 : 415 - 438
- [50] A Hybrid Intelligence Algorithm for No-wait Flow Shop Scheduling ADVANCES IN MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-4, 2013, 712-715 : 2447 - +