A model for the development and implementation of a national plan for the optimal management of early spondyloarthritis: the Esperanza Program

被引:34
|
作者
Munoz-Fernandez, Santiago [2 ]
Carmona, Loreto [1 ]
Collantes, Eduardo [3 ,4 ]
Mulero, Juan [5 ,6 ]
Jesus Garcia-Yebenes, M. [1 ]
de Miguel, Eugenio [7 ]
Almodovar, Raquel [8 ]
Fernandez-Carballido, Cristina [9 ]
Garcia Llorente, Jose Francisco [10 ]
Gobbo, Milena [1 ]
机构
[1] Soc Espanola Reumatol, Res Unit, Madrid 28001, Spain
[2] Hosp Infanta Sofia, Rheumatol Unit, Madrid, Spain
[3] Hosp Univ Reina Sofia, Dept Rheumatol, Cordoba, Spain
[4] Univ Cordoba, Sch Med, Cordoba, Spain
[5] Hosp Univ Puerta de Hierro Majadahonda, Dept Rheumatol, Madrid, Spain
[6] Univ Autonoma Madrid, Madrid, Spain
[7] Hosp Univ La Paz, Dept Rheumatol, Madrid, Spain
[8] Hosp Univ Fdn Alcorcon, Dept Rheumatol, Madrid, Spain
[9] Hosp Gen Elda, Rheumatol Unit, Elda, Spain
[10] Hosp Basurto, Dept Rheumatol, Basurto, Spain
关键词
ANKYLOSING-SPONDYLITIS; ARTHRITIS; REGISTRY; MULTICENTER; TRIAL; SPAIN;
D O I
10.1136/ard.2010.141200
中图分类号
R5 [内科学];
学科分类号
1002 ; 100201 ;
摘要
Objectives To evaluate the performance of a healthcare programme in early spondyloarthritis (SpA). Methods Based on previous analyses and expectations of a nominal group, the following were set: (1) minimum standards to create early SpA units; (2) standard operating procedures; and (3) eight performance indicators that can be measured in real time using a web-based platform. Results At the end of the evaluation of the programme the expected level of performance was achieved in three of the indicators: 'referral reliability' (standard (S) > 50%, real value (RV) 92%), 'accessibility' (S > 90%, RV=91%) and 'duration of first visit' (S > 50%, RV=53%). The performance in the remaining indicators was inferior: 'success of referral criteria' (S > 50%, RV=28%), 'clinical reports issued' (S > 90%, RV=25%), 'feedback guarantee' (S > 85%, RV=2%), 'missing data' (S < 10%, RV= 24%) and 'frequency of review' (S > 90%, RV=84%). Explanations for the low performance are provided. Conclusions It is possible to implement a large-scale programme that is measurable.
引用
收藏
页码:827 / 830
页数:4
相关论文
共 50 条
  • [31] NEWSDIG: The National Early Warning Score Development and Implementation Group
    Jones, Mike
    CLINICAL MEDICINE, 2012, 12 (06) : 501 - 503
  • [32] Implementation of a National Early Psychosis Clinical Support Program in the United States: The Prodrome and Early Psychosis Program Network (PEPPNET)
    Adelsheim, Steven
    Harrison, Vicki
    Heinssen, Robert
    Lowe, Jane Isaacs
    Blau, Gary M.
    EARLY INTERVENTION IN PSYCHIATRY, 2016, 10 : 23 - 23
  • [33] Development and Implementation of an Online Pain Management Continuing Education Program
    Scott-Richardson, Maya
    Johnson, Guinevere
    McGlorthan, Latoya
    Webber, Robert
    Kirk, Keri
    Giordano, Nicholas
    Kryzek, Monika
    Highland, Krista
    PAIN MANAGEMENT NURSING, 2022, 23 (06) : 752 - 758
  • [34] Integrated model for implementation and development of knowledge management
    Medrano Castillo, Lucio Abimael
    Cazarini, Edson Walmir
    KNOWLEDGE MANAGEMENT RESEARCH & PRACTICE, 2014, 12 (02) : 145 - 160
  • [35] Oiling the wheels of sub-national development: An overview of development plan implementation in the Western region of Ghana
    Ackah, Ishmael
    Osei, Edna
    Tuokuu, Francis Xavier Dery
    Bobio, Crispin
    EXTRACTIVE INDUSTRIES AND SOCIETY-AN INTERNATIONAL JOURNAL, 2019, 6 (02): : 343 - 357
  • [36] Development of a hybrid model to plan segment based optimal promotion strategy
    Ekinci, Yeliz
    Guran, Aysun
    INTERNATIONAL JOURNAL OF MARKET RESEARCH, 2023, 65 (05) : 642 - 662
  • [37] Early Development of an Interdisciplinary Construction Engineering Management Program
    Clevenger, Caroline
    Brothers, Heidi
    Abdallah, Moatassem
    Wolf, Kenneth
    CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 47 - 57
  • [38] CHOOSING A MANAGEMENT DEVELOPMENT PROGRAM - DECISION MODEL
    VONDEREMBSE, TJ
    PERSONNEL JOURNAL, 1973, 52 (10) : 907 - 912
  • [39] MANAGEMENT SYSTEM COMPETENCY MODEL AND DEVELOPMENT PROGRAM
    Jean, Mark S.
    Sikorski, Lynn A.
    Zaleschuk, Laura P.
    PROCEEDINGS OF THE 12TH INTERNATIONAL PIPELINE CONFERENCE, 2018, VOL 2, 2018,
  • [40] Development and implementation of a watershed management plan for Lac la Biche, Alberta, Canada
    White, J.
    Rawles, M.
    WATER SCIENCE AND TECHNOLOGY, 2006, 53 (10) : 261 - 267