The suitability of risk reduction indicators to inform dam safety management

被引:25
|
作者
Morales-Torres, Adrian [1 ]
Serrano-Lombillo, Armando [2 ]
Escuder-Bueno, Ignacio [2 ]
Altarejos-Garcia, Luis [3 ]
机构
[1] iPresas Risk Anal, Valencia, Spain
[2] Univ Politecn Valencia, Res Inst Water & Environm Engn, Valencia, Spain
[3] Univ Politecn Cartagena Ud, Predept Ingn Civil, Cartagena, Spain
关键词
Dam safety; decision-making; risk management; risk & probability analysis; quantitative analysis; risk reduction indicators; risk reduction principles; equity & efficiency; STATISTICAL LIFE; COST; INFRASTRUCTURE; EQUITY;
D O I
10.1080/15732479.2015.1136830
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Risk analysis can provide very suitable and useful information to manage the safety of critical civil infrastructures. Indeed, results of quantitative risk models can be used to inform prioritisation of safety investments on infrastructures' assets and portfolios. In order to inform this prioritisation, a series of risk reduction indicators can be used. This paper reviews existing indicators for dam safety, tracks how equity and efficiency principles are captured, propose additional indicators and provides insights into how tolerability guidelines and benefit-cost analysis can also play a role in decision-making. All reviewed, analysed and/or combined indicators are later applied in a case study, a portfolio of 27 dams where 93 structural and non-structural investments are prioritised. The case study shows that prioritisation sequences based on risk model results provide suitable and useful information, acknowledging that other concerns may be conditioning decision-making processes. With the results of the case study, a full comparison between all studied risk reduction indicators is made, and three indexes are calculated for all of them to measure how close they are to a theoretical best.
引用
收藏
页码:1465 / 1476
页数:12
相关论文
共 50 条
  • [31] Google Trends indicators to inform water planning and drought management
    Wilby, R. L.
    Murphy, C.
    O'Connor, P.
    Thompson, J. J.
    Matthews, T.
    GEOGRAPHICAL JOURNAL, 2024, 190 (03):
  • [32] Dealing with epistemic uncertainty in risk-informed decision making for dam safety management
    Morales-Torres, Adrian
    Escuder-Bueno, Ignacio
    Serrano-Lombillo, Armando
    Castillo Rodriguez, Jesica T.
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2019, 191
  • [33] THE STRATEGY OF OCCUPATIONAL RISK MANAGEMENT THROUGH THE ANALYSIS OF KEY INDICATORS OF MONITORING SAFETY
    Levashov, S. P.
    Karnachev, I. P.
    Cheltybashev, A. A.
    PROCEEDINGS OF THE TULA STATES UNIVERSITY-SCIENCES OF EARTH, 2018, 2 : 146 - 153
  • [34] On management of safety monitoring work for RCC dam
    Ren Min Chang Jiang, 5 (47-49):
  • [35] Dam Safety through Sustainable Personnel Management
    Fries, Juergen
    WASSERWIRTSCHAFT, 2010, 100 (04) : 26 - 28
  • [36] Risk analysis for flood prevention and safety of dam
    Mei, Ya-Dong
    Tan, Guang-Ming
    Wuhan Daxue Xuebao (Gongxue Ban)/Engineering Journal of Wuhan University, 2002, 35 (06):
  • [37] On the Physical Meaning of Dam Safety Risk Estimates
    Galic, Dom
    GEO-RISK 2017: GEOTECHNICAL RISK ASSESSMENT AND MANAGEMENT, 2017, (285): : 147 - 157
  • [38] Australian practice in Dam safety Risk Assessment
    Fell, R
    REDUCING RISK FROM EXTREME EVENTS, 2003, : 1 - 21
  • [39] Risk assessment for dam safety - A framework for understanding
    Von Thun, JL
    MANAGING THE RISKS OF DAM PROJECT DEVELOPMENT, SAFETY AND OPERATION, 1998, : 95 - 111
  • [40] Dam safety and risk of extreme and catastrophic events
    Walker, WW
    RISK-BASED DECISION MAKING IN WATER RESOURCES VIII, 1998, : 212 - 215