共 50 条
- [31] Manufacture and delivery of a new EPB TBM for the Moscow Metro extension - Second Circle Line UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 2304 - 2310
- [32] Flood protection of Prague Metro after the 2002 flood UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 1303 - 1308
- [33] EXTENSION OF METRO LINE 5 TO BOBIGNY. TECHNICAL FEATURES OF CIVIL ENGINEERING WORK. French Railway Review, 1984, 2 (03): : 179 - 188
- [34] Extension of the Hong-Kong Metro-line Two: Central Tsen Wan. Travaux Paris, 1982, (571): : 27 - 32
- [35] The degree of deterioration of the tunnels of the prague metro based on a monitoring assessment ACTA GEOTECHNICA SLOVENICA, 2007, 4 (02): : 34 - 47
- [37] Preparation of ISPRS Prague Declaration GIM INTERNATIONAL-THE WORLDWIDE MAGAZINE FOR GEOMATICS, 2016, 30 (07): : 41 - 42
- [38] Extension of Paris Metro Line 5 to Bobigny. Technical Features of the Civil Engineering Work. Revue Generale des Chemins de Fer, 1983, 102 (11): : 689 - 698