Design of multiproduct batch plants with semicontinuous stages and storage tanks

被引:0
|
作者
Montagna, JM [1 ]
Vecchietti, AR [1 ]
机构
[1] Fac Reg Santa Fe, INGAR, Inst Desarrollo & Diseno, UTN, Santa fe, Argentina
关键词
multiproduct batch plants; batch plant design; intermediate storage tanks;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this work a detailed model for the design of multiproduct batch plant is presented. The impact of the intermediate storage tank allocation is analyzed considering different alternatives. In previous works presented in the literature, the relationship between the tank location and the semicontinuous stages was ignored. In the present model we analyzed several expressions related to the operation time for the stages of the batch plant. These expressions are included in the Mixed Integer Non Linear Model (MINLP) formulated for the plant design.
引用
收藏
页码:289 / 293
页数:5
相关论文
共 50 条
  • [41] OPTIMAL-DESIGN AND OPERATION OF A BATCH PROCESS WITH INTERMEDIATE STORAGE TANKS
    TAKAMATSU, T
    HASHIMOTO, I
    HASEBE, S
    INDUSTRIAL & ENGINEERING CHEMISTRY PROCESS DESIGN AND DEVELOPMENT, 1982, 21 (03): : 431 - 440
  • [43] A new approach for efficient rescheduling of multiproduct batch plants
    Vin, JP
    Ierapetritou, MG
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2000, 39 (11) : 4228 - 4238
  • [44] EVALUATION AND OPTIMIZATION OF STOCHASTIC FLEXIBILITY IN MULTIPRODUCT BATCH PLANTS
    STRAUB, DA
    GROSSMANN, IE
    COMPUTERS & CHEMICAL ENGINEERING, 1992, 16 (02) : 69 - 87
  • [45] A CP formulation for scheduling multiproduct multistage batch plants
    Zeballos, Luis J.
    Novas, Juan M.
    Henning, Gabriela P.
    COMPUTERS & CHEMICAL ENGINEERING, 2011, 35 (12) : 2973 - 2989
  • [46] SIMULTANEOUS SYNTHESIS, SIZING, AND SCHEDULING OF MULTIPRODUCT BATCH PLANTS
    BIREWAR, DB
    GROSSMANN, IE
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1990, 29 (11) : 2242 - 2251
  • [47] SIMULTANEOUS PRODUCTION PLANNING AND SCHEDULING IN MULTIPRODUCT BATCH PLANTS
    BIREWAR, DB
    GROSSMANN, IE
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1990, 29 (04) : 570 - 580
  • [48] An Extended Formulation for the Flexible Short-Term Scheduling of Multiproduct Semicontinuous Plants
    Capon-Garcia, Elisabet
    Ferrer-Nadal, Sergio
    Graells, Moises
    Puigjaner, Luis
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2009, 48 (04) : 2009 - 2019
  • [49] Design of energy storage systems for batch process plants
    SadrKazemi, N
    Polley, GT
    CHEMICAL ENGINEERING RESEARCH & DESIGN, 1996, 74 (A5): : 584 - 596
  • [50] Design of energy storage systems for batch process plants
    Sadr-Kazemi, N.
    Polley, G.T.
    Chemical Engineering Research and Design, 1996, 74 (A5): : 584 - 596