Integrating Hoisting Efficiency into Construction Site Layout Plan Model for Prefabricated Construction

被引:35
|
作者
Lu, Ying [1 ]
Zhu, Yaqian [1 ]
机构
[1] Southeast Univ, Sch Civil Engn, 2 Southeast Univ Rd, Nanjing 211189, Jiangsu, Peoples R China
关键词
Prefabricated construction site; Construction site layout planning; Safety risk; Transportation cost; Hoisting efficiency; SAFETY CONSIDERATIONS; NOISE-POLLUTION; OPTIMIZATION; ALGORITHMS; BUILDINGS; COST;
D O I
10.1061/(ASCE)CO.1943-7862.0002158
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction site layout plans (CSLP) are vitally significant to prefabricated construction project management; in particular, abundant hoisting operations reinforce the importance of the location of tower cranes and precast component supply points. However, previous studies on CSLP have been conducted on traditional construction sites, and there is a gap in the research regarding the prefabricated construction site layout plan. This paper attempts to establish a comprehensive CSLP model to optimize the facility layout problem on prefabricated construction sites, integrating the hoisting efficiency of precast components into previous studies on CSLP considering safety risks and transportation cost. To solve the proposed multiobjective model, the Genetic algorithms (GAs) is applied to obtain Pareto optimal solutions due to its strong global search capability. To verify the feasibility and effectiveness of the proposed model, a prefabricated residential building project is studied as a case study. This paper attempts to improve the CSLP model for the scene of prefabricated construction in the preconstruction stage to optimize safety risk, transportation cost, and hoisting efficiency, which may facilitate future research attempting to improve the prefabricated construction site layout considering more complex actual situations.
引用
收藏
页数:15
相关论文
共 50 条
  • [21] Analyzing Construction Workers' Unsafe Behaviors in Hoisting Operations of Prefabricated Buildings Using HAZOP
    Zhu, Lianbo
    Ma, Hongxin
    Huang, Yilei
    Liu, Xun
    Xu, Xiaojin
    Shi, Zhenqun
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2022, 19 (22)
  • [22] Safety Risk Analysis for Prefabricated Building Hoisting Construction Based on STPA-BN
    Pan, Ziyao
    Wang, Junwu
    Wang, Jing
    Tian, Mengyuan
    Liu, Sen
    ICCREM 2021: CHALLENGES OF THE CONSTRUCTION INDUSTRY UNDER THE PANDEMIC, 2021, : 171 - 180
  • [23] Hybrid intelligence utilization for construction site layout
    Zhang, JP
    Liu, LH
    Coble, RJ
    AUTOMATION IN CONSTRUCTION, 2002, 11 (05) : 511 - 519
  • [24] ArcSite: Enhanced GIS for construction site layout
    Cheng, MY
    OConnor, JT
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (04): : 329 - 336
  • [25] Proposed genetic algorithms for construction site layout
    Mawdesley, MJ
    Al-Jibouri, SH
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2003, 16 (5-6) : 501 - 509
  • [26] Proposing a multifaceted model for adopting prefabricated construction technology in the construction industry
    Yuan, Mengqi
    Li, Zhongfu
    Li, Xiaodong
    Luo, Xiaowei
    Yin, Xianfei
    Cai, Jin
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (02) : 755 - 786
  • [27] Safety Risk Assessment of Prefabricated Buildings Hoisting Construction: Based on IHFACS-ISAM-BN
    Wang, Junwu
    Guo, Feng
    Song, Yinghui
    Liu, Yipeng
    Hu, Xuan
    Yuan, Chunbao
    BUILDINGS, 2022, 12 (06)
  • [28] Construction site layout optimization model considering cost and safety in a dynamic environment
    Jaafar K.
    Elbarkouky R.
    Kennedy J.
    Asian Journal of Civil Engineering, 2021, 22 (2) : 297 - 312
  • [29] A Typology Model of Temporary Facility Constraints for Automated Construction Site Layout Planning
    Kim, Minguk
    Ryu, Han-Guk
    Kim, Tae Wan
    APPLIED SCIENCES-BASEL, 2021, 11 (03): : 1 - 21
  • [30] An Intelligent Logistics Management Model in Prefabricated Construction
    Chongguang Feng
    Hao Hu
    Feng Xu
    Jian Yang
    Frontiers of Engineering Management, 2015, 2 (02) : 178 - 181