Monitoring-Based Assessment of the Construction Influence of Benoto Pile on Adjacent High-Speed Railway Bridge: Case Study

被引:10
|
作者
Zhang, Y. M. [1 ]
Wang, H. [1 ]
Mao, J. X. [1 ]
Wang, F. Q. [2 ]
Hu, S. T. [3 ]
Zhao, X. X. [3 ]
机构
[1] Southeast Univ, Minist Educ, Key Lab C&PC Struct, Nanjing 211189, Jiangsu, Peoples R China
[2] China Railway 24p Co Ltd, 2 Huiwen Rd, Shanghai 20071, Peoples R China
[3] China Acad Railway Sci, Railway Engn Res Inst, Beijing 100081, Peoples R China
关键词
High-speed railway (HSR); Monitoring; Benoto pile; Construction influence; Adjacent piers; IMPACTS; CHINA;
D O I
10.1061/(ASCE)CF.1943-5509.0001258
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
With the rapid expansion of the high-speed railway (HSR) network in China, some new lines must be constructed near or across existing HSRs, which will likely have an effect on the operational safety of the HSRs. The existing HSR bridges are highly sensitive to the construction influence of the adjacent piles, and a small displacement of HSR bridges may cause high-speed trains to derail, with disastrous consequences. Consequently, pile construction adjacent to HSRs should be accompanied by an appropriate method to mitigate its detrimental effects on HSRs. The Benoto method is considered to be environmentally friendly and economical because of its fast construction efficiency, low slurry discharge, and no risk of shaft necking. Few studies have been done investigating the influence of Benoto pile construction on adjacent HSR bridges. This study fully explores the construction influence of Benoto piles on neighboring HSR bridges. Specifically, the Nanjing S3 Metro Line project in China serves as the test bed, and a comprehensive field monitoring system was installed to measure soil displacement and stress as well as HSR bridge pier displacement. Several observations can be made on the basis of this study: (1)the variation in soil stress and lateral movements is slight when the distance between the pile and the soil exceeds 18m; (2)the settlement of the surrounding soil is especially obvious when the steel casing is pulled out; and (3)the settlement of soil at the bridge site and the horizontal displacements and inclination angles of existing piers do not exceed the corresponding warning, which indicates the safe operational condition of the adjacent HSR during the construction of Benoto piles. The findings of this work may provide useful guidance for the design and construction of piles adjacent to in-service HSRs.
引用
收藏
页数:11
相关论文
共 50 条
  • [21] Earthquake Influence on the Rail Irregularity on High-Speed Railway Bridge
    Lai, Zhipeng
    Kang, Xin
    Jiang, Lizhong
    Zhou, Wangbao
    Feng, Yulin
    Zhang, Yuntai
    Yu, Jian
    Nie, Leixin
    [J]. SHOCK AND VIBRATION, 2020, 2020
  • [22] Study on Mechanical Properties and Field Monitoring of Ballastless CWR on the Bridge in High-speed Railway
    Chen, Bojing
    Cai, Xiaopei
    Shi, Xiaobo
    [J]. SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT PROTECTION, PTS 1-3, 2013, 361-363 : 1449 - +
  • [23] Rotation construction of heavy swivel arch bridge for high-speed railway
    Feng, Yu
    Qi, Jianan
    Wang, Jingquan
    Zhang, Wenxue
    Zhang, Qifeng
    [J]. STRUCTURES, 2020, 26 : 755 - 764
  • [24] Influence of Groundwater Lowering on Pile Group Foundation of High Speed Railway Bridge
    Dong L.
    Su Y.
    Fu L.
    Bian X.
    [J]. Zhongguo Tiedao Kexue/China Railway Science, 2019, 40 (04): : 1 - 9
  • [25] Wavelet analysis deformation monitoring data of high-speed railway bridge
    Tang, ShiHua
    Huang, Qing
    Zhou, Conglin
    Xu, HongWei
    Liu, YinTao
    Li, FeiDa
    [J]. INTERNATIONAL CONFERENCE ON INTELLIGENT EARTH OBSERVING AND APPLICATIONS 2015, 2015, 9808
  • [26] Analysis of the static monitoring data for CWR on high-speed railway bridge
    Zhang, Peng-Fei
    Lei, Xiao-Yan
    Gao, Liang
    Liu, Qing-Jie
    [J]. Journal of Railway Engineering Society, 2016, 33 (11) : 40 - 44
  • [27] Long-term settlement prediction of high-speed railway bridge pile foundation
    杨奇
    冷伍明
    张升
    聂如松
    魏丽敏
    赵春彦
    刘维正
    [J]. Journal of Central South University, 2014, 21 (06) : 2415 - 2424
  • [28] Long-term settlement prediction of high-speed railway bridge pile foundation
    Qi Yang
    Wu-ming Leng
    Sheng Zhang
    Ru-song Nie
    Li-min Wei
    Chun-yan Zhao
    Wei-zheng Liu
    [J]. Journal of Central South University, 2014, 21 : 2415 - 2424
  • [29] Long-term settlement prediction of high-speed railway bridge pile foundation
    Yang Qi
    Leng Wu-ming
    Zhang Sheng
    Nie Ru-song
    Wei Li-min
    Zhao Chun-yan
    Liu Wei-zheng
    [J]. JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2014, 21 (06) : 2415 - 2424
  • [30] Model test on pile group foundation of a high-speed railway bridge above a goaf
    Liang Xin
    Cheng Qin-gong
    Chen Jian-ming
    Li Liang-guang
    [J]. ROCK AND SOIL MECHANICS, 2015, 36 (07) : 1865 - 1876