Solving a bi-criteria permutation flow-shop problem using shuffled frog-leaping algorithm

被引:82
|
作者
Rahimi-Vahed, Alireza [1 ]
Mirzaei, Ali Hossein [1 ]
机构
[1] Tarbiat Modares Univ, Dept Ind Engn, Fac Engn, Tehran, Iran
关键词
bi-criteria permutation flow shop scheduling; multi-objective shuffled frog-leaping algorithm; multi-objective genetic algorithm;
D O I
10.1007/s00500-007-0210-y
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Flow shop problems as a typical manufacturing challenge have gained wide attention in academic fields. In this paper, we consider a bi-criteria permutation flow shop scheduling problem, where the weighted mean completion time and the weighted mean tardiness are to be minimized simultaneously. Due to the complexity of the problem, it is very difficult to obtain optimum solution for this kind of problems by means of traditional approaches. Therefore, a new multi-objective shuffled frog-leaping algorithm (MOSFLA) is introduced for the first time to search locally Pareto-optimal frontier for the given problem. To prove the efficiency of the proposed algorithm, various test problems are solved and the reliability of the proposed algorithm, based on some comparison metrics, is compared with three distinguished multi-objective genetic algorithms, i.e. PS-NC GA, NSGA-II, and SPEA-II. The computational results show that the proposed MOSFLA performs better than the above genetic algorithms, especially for the large-sized problems.
引用
收藏
页码:435 / 452
页数:18
相关论文
共 50 条
  • [21] A shuffled frog-leaping algorithm for job shop scheduling with outsourcing options
    Lei, Deming
    Guo, Xiuping
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (16) : 4793 - 4804
  • [22] A shuffled frog-leaping algorithm with memeplex quality for bi-objective distributed scheduling in hybrid flow shop
    Cai, Jingcao
    Lei, Deming
    Li, Ming
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (18) : 5404 - 5421
  • [23] An algorithm based on discrete shuffled frog leaping for No-idle permutation flow shop scheduling problem
    Wang, Ya-Min
    Ji, Jun-Zhong
    Pan, Quan-Ke
    Beijing Gongye Daxue Xuebao / Journal of Beijing University of Technology, 2010, 36 (01): : 124 - 130
  • [24] An Improved Shuffled Frog-Leaping Algorithm to Solving 0-1 Knapsack Problem
    Zhang, Jianhao
    Jiang, Wei
    Zhao, Kang
    IEEE ACCESS, 2024, 12 : 148155 - 148166
  • [25] Dynamic shuffled frog-leaping algorithm for distributed hybrid flow shop scheduling with multiprocessor tasks
    Cai, Jingcao
    Zhou, Rui
    Lei, Deming
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2020, 90
  • [26] Hybrid Shuffled Frog-leaping Algorithm for Distributed Flexible Job Shop Scheduling
    Meng, Leilei
    Zhang, Biao
    Ren, Yaping
    Zhang, Chaoyong
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2021, 57 (17): : 263 - 272
  • [27] An Improved Shuffled Frog-Leaping Algorithm for Solving the Dynamic and Continuous Berth Allocation Problem (DCBAP)
    Hsu, Hsien-Pin
    Chiang, Tai-Lin
    APPLIED SCIENCES-BASEL, 2019, 9 (21):
  • [28] An Improved Genetic-Shuffled Frog-Leaping Algorithm for Permutation Flowshop Scheduling
    Wu, Peiliang
    Yang, Qingyu
    Chen, Wenbai
    Mao, Bingyi
    Yu, Hongnian
    COMPLEXITY, 2020, 2020
  • [29] Modified shuffled frog-leaping algorithm to solve traveling salesman problem
    College of Information Engineering, Shenzhen University, Shenzhen 518060, China
    Tongxin Xuebao, 2009, 7 (130-135):
  • [30] A Hybrid Shuffled Frog-Leaping Algorithm for the University Examination Timetabling Problem
    Leite, Nuno
    Melicio, Fernando
    Rosa, Agostinho C.
    COMPUTATIONAL INTELLIGENCE, IJCCI 2013, 2016, 613 : 173 - 188