共 50 条
- [41] Two-Stage Robust Expansion Planning of Transmission Network Considering Uncertainty of Offshore Wind Power Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2024, 58 (09): : 1400 - 1409
- [43] A Joint Chance Constrained Economic Dispatch Model Considering Wind Generation and Dynamic Line Rating 2021 IEEE PES INNOVATIVE SMART GRID TECHNOLOGIES - ASIA (ISGT ASIA), 2021,
- [45] A two-stage dynamic reconfiguration method for distribution networks considering wind and solar power Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2023, 51 (21): : 12 - 21
- [46] Two-stage stochastic optimization for unit commitment considering wind power based on scenario analysis 2016 CHINA INTERNATIONAL CONFERENCE ON ELECTRICITY DISTRIBUTION (CICED), 2016,
- [48] Economic Load Dispatch with Stochastic Wind Power: Model and Solutions 2010 IEEE PES TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXPOSITION: SMART SOLUTIONS FOR A CHANGING WORLD, 2010,
- [49] Two-stage optimal dispatch for wind power integrated power system considering operational risk and reserve availability Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2022, 50 (11): : 139 - 148