Research on Automatic Leveling System of Railway Rescue Crane

被引:2
|
作者
Zhang, Ling [1 ]
Shao, Junpeng [1 ]
Sun, Guitao [1 ]
Gao, Bingwei [1 ]
Jin, Zhaohui [1 ]
Zhu, Jian [1 ]
Mu, Xiaoning [1 ]
机构
[1] Harbin Univ Sci & Technol, Mech & Power Engn Coll, Harbin, Heilongjiang Pr, Peoples R China
来源
关键词
Railway rescue crane; Automatic leveling; Fuzzy PID; PID;
D O I
10.4028/www.scientific.net/AMR.909.241
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Automatic leveling system used in railway rescue crane has characteristics such as time variance, nonlinearity and strong interference, which bring a variety of difficulties in control process into existence. This paper introduces the working principle and mathematical model of automatic leveling system used in railway rescue crane. A fuzzy PID controller based on fuzzy logic control algorithm and conventional PID algorithm is designed, MATLAB simulation results show that the effectiveness of the proposed fuzzy PID controller, and the fuzzy PID control strategy has better effect on the automatic leveling system used in railway rescue crane.
引用
收藏
页码:241 / 246
页数:6
相关论文
共 50 条
  • [31] Development of Automatic Railway Train Safety System
    Tour, Rithik Shia
    Narwade, Subodh Sanjay
    Sathe, Ajit Rajendra
    Ghuge, Nilam N.
    2023 9TH INTERNATIONAL CONFERENCE ON ELECTRICAL ENERGY SYSTEMS, ICEES, 2023, : 5 - 8
  • [32] The Mathematical Model of System to Support Rescue Operations at Railway Accidents
    Torun, A.
    Sokolowska, L.
    TRANSPORT MEANS 2017, PTS I-III, 2017, : 39 - 42
  • [33] A strategic planning model for the railway system accident rescue problem
    Cheng, Yung-Hsiang
    Liang, Zheng-Xian
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2014, 69 : 75 - 96
  • [34] Study on method for assessment of vulnerability of railway emergency rescue system
    Li, X.-P. (lixiaopingtd@mail.lzjtu.cn), 1600, Science Press (35):
  • [35] Development of automatic welding system for crawler crane latticed booms
    Thai Kobelco Construction Machinery Ltd.
    R and D Kobe Steel Eng Reps, 2007, 1 (86-89):
  • [36] Design and experiment of automatic leveling control system for orchards lifting platform
    Fan G.
    Wang Y.
    Zhang X.
    Zhao J.
    Song Y.
    Zhang, Xiaohui (Zhangxh@sdau.edu.cn), 1600, Chinese Society of Agricultural Engineering (33): : 38 - 46
  • [37] Research on scheduling management system for crawler crane
    He, Huan
    Fan, Yecai
    Gong, Changsheng
    Li, Tao
    Ship Building of China, 2016, 57 : 552 - 559
  • [38] Design and Study of Leg Automatic Leveling Control System of Military Bridge
    Li Hui
    Shi XiaoHua
    Wang Biao
    Zhu XiaoQing
    2017 16TH IEEE/ACIS INTERNATIONAL CONFERENCE ON COMPUTER AND INFORMATION SCIENCE (ICIS 2017), 2017, : 311 - 314
  • [39] A New Automatic Identification System of RTG crane in Container Terminal
    Yang Junqing
    Sui Meie
    2014 IEEE INTERNATIONAL CONFERENCE ON INFORMATION AND AUTOMATION (ICIA), 2014, : 1051 - 1054
  • [40] AUTOMATIC CRANE LOAD-TRANSFER SYSTEM FOR OFFSHORE OPERATION
    不详
    MEASUREMENT AND CONTROL, 1977, 10 (06): : 204 - 204