Optimizing ERP readiness improvements under budgetary constraints

被引:17
|
作者
Ahmadi, Sadra [1 ]
Yeh, Chung-Hsing [1 ]
Martin, Rodney [1 ]
Papageorgiou, Elpiniki [2 ]
机构
[1] Monash Univ, Fac Informat Technol, Clayton, Vic 3800, Australia
[2] Technol Educ Inst TEI Cent Greece, Dept Comp Engn, Lamia 35100, Greece
关键词
Enterprise resource planning (ERP); Fuzzy cognitive maps (FCM); Evolutionary algorithm; NSGA-II; ERP readiness analysis; MULTIOBJECTIVE EVOLUTIONARY ALGORITHMS; FUZZY COGNITIVE MAP; GENETIC ALGORITHM; COST ESTIMATION; OPTIMIZATION; IMPLEMENTATION; DESIGN; SEARCH; SYSTEM; MODEL;
D O I
10.1016/j.ijpe.2014.11.020
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
An organization needs to be ready before implementing a complex enterprise resource planning (ERP) system. To achieve this aim, organization has to address two questions: (1) "is the organization sufficiently ready to accept an ERP system" and (2) "what is the most cost effective plan for improving the readiness, if the organization is not sufficiently ready?". To estimate the current readiness an organization must consider the interrelationships between influential readiness factors and find the best improvement plan as a multi-objective trade-off between the two objectives of maximum readiness and lowest cost. In this paper we demonstrate how to calculate the readiness, and then solve the multi-objective optimization problem. We estimate readiness by using fuzzy cognitive maps to include all the complex causal relationships between factors. We solve the multi-objective optimization problem by using the NSGA-II evolutionary algorithm. The final result is a set of optimal improvement plans where an organization can choose which plan suits it the best. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:105 / 115
页数:11
相关论文
共 50 条
  • [21] Modern pschopharmacotherapy despite budgetary constraints
    Möller, HJ
    PSYCHOPHARMAKOTHERAPIE, 2000, 7 (02): : 49 - 49
  • [22] Outsourcing Strategies in Public Services under Budgetary Constraints: Analysing Perceptions of Public Managers
    João Paulo Santos Aragão
    Marcele Elisa Fontana
    Public Organization Review, 2022, 22 : 61 - 77
  • [23] Outsourcing Strategies in Public Services under Budgetary Constraints: Analysing Perceptions of Public Managers
    Santos Aragao, Joao Paulo
    Fontana, Marcele Elisa
    PUBLIC ORGANIZATION REVIEW, 2022, 22 (01) : 61 - 77
  • [24] OPTIMIZING UTILIZATION UNDER RESPONSE TIME CONSTRAINTS.
    Heiss, H.-U.
    Totzauer, G.
    Computing (Vienna/New York), 1985, 35 (01): : 1 - 12
  • [25] Best-Effort Top-k Query Processing Under Budgetary Constraints
    Shmueli-Scheuer, Michal
    Li, Chen
    Mass, Yosi
    Roitman, Haggai
    Schenkel, Ralf
    Weikum, Gerhard
    ICDE: 2009 IEEE 25TH INTERNATIONAL CONFERENCE ON DATA ENGINEERING, VOLS 1-3, 2009, : 928 - +
  • [26] OPTIMIZING UTILIZATION UNDER RESPONSE-TIME CONSTRAINTS
    HEISS, HU
    TOTZAUER, G
    COMPUTING, 1985, 35 (01) : 1 - 12
  • [27] Optimizing the Chase: Scalable Data Integration under Constraints
    Konstantinidis, George
    Ambite, Jose Luis
    PROCEEDINGS OF THE VLDB ENDOWMENT, 2014, 7 (14): : 1869 - 1880
  • [28] Optimizing the Reliability of Streaming Applications Under Throughput Constraints
    Anne Benoit
    Hinde Lilia Bouziane
    Yves Robert
    International Journal of Parallel Programming, 2011, 39 : 584 - 614
  • [29] Optimizing evaluation quality and utility under resource constraints
    Mowbray, CT
    Bybee, D
    Collins, ME
    Levine, P
    EVALUATION AND PROGRAM PLANNING, 1998, 21 (01) : 59 - 71
  • [30] DETERMINISTIC EQUIVALENTS FOR OPTIMIZING AND SATISFICING UNDER CHANCE CONSTRAINTS
    CHARNES, A
    COOPER, WW
    OPERATIONS RESEARCH, 1963, 11 (01) : 18 - 39