共 50 条
- [22] Personnel scheduling in laboratories PRACTICE AND THEORY OF AUTOMATED TIMETABLING IV, 2003, 2740 : 113 - 119
- [23] Personnel resource scheduling PICMET '07: PORTLAND INTERNATIONAL CENTER FOR MANAGEMENT OF ENGINEERING AND TECHNOLOGY, VOLS 1-6, PROCEEDINGS: MANAGEMENT OF CONVERGING TECHNOLOGIES, 2007, : 2633 - 2655
- [25] WITH PERSONNEL REDUCTION THE TREASURY IS STARTING TO FEEL IT STAHL UND EISEN, 1995, 115 (04): : 126 - 128
- [27] Solving personnel tour scheduling problems using the dual all-integer cutting plane IIE Transactions (Institute of Industrial Engineers), 1998, 30 (09): : 835 - 844
- [28] Solving real-time scheduling problems with model-checking EMBEDDED SOFTWARE AND SYSTEMS, PROCEEDINGS, 2005, 3820 : 186 - 197
- [30] On the starting point of curvature for reflected diffracted shock wave (subsonic and sonic cases) Shock Waves, 2003, 13 : 323 - 326