共 50 条
- [41] Minimizing weighted earliness–tardiness on a single machine with a common due date using quadratic models TOP, 2012, 20 : 754 - 767
- [45] Earliness and tardiness production planning with due-date for multi-location OKP manufacturing systems Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2000, 6 (05): : 52 - 57
- [47] A fast FPTAS for single machine scheduling problem of minimizing total weighted earliness and tardiness about a large common due date OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2020, 90
- [48] DUE-DATE DETERMINATION FOR A SINGLE-MACHINE SHOP WITH SPT DISPATCHING ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1986, 10 (01): : 35 - 41
- [49] The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times Annals of Operations Research, 2008, 159 : 25 - 40