共 50 条
- [33] SELECTING A CONTRACTOR FOR FAST-TRACK PROJECTS. PART II. QUANTITATIVE EVALUATION METHOD. Plant Engineering (Barrington, Illinois), 1985, 39 (18): : 54 - 56
- [35] Resistance Torque Based Variable Duty-Cycle Control Method for a Stage II Compressor Chinese Journal of Mechanical Engineering, 2017, 30 : 876 - 887
- [37] Presentation and evaluation of a new multi-stage parameter estimation method using advective transport observations CALIBRATION AND RELIABILITY IN GROUNDWATER MODELLING, 1996, (237): : 179 - 188
- [38] Development of an objective fabric pilling evaluation method. II. Fabric pilling grading using artificial neural network Fibers and Polymers, 2013, 14 : 2157 - 2162
- [40] Verification, validation, and parameter study of a computational model for corrosion pit growth adopting the level-set method. Part II: Stress corrosion Materials Today Communications, 2022, 33