Investigation of failure prediction of open-pit coal mine landslides containing complex geological structures using the inverse velocity method

被引:23
|
作者
Du, Han [1 ]
Song, Danqing [1 ]
机构
[1] Tsinghua Univ, Dept Hydraul Engn, State Key Lab Hydrosci & Engn, Beijing 100084, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
Failure time of landslide; Open-pit coal mine; Conventional inverse velocity; Early warning; Field monitoring; ROCK SLOPE; TIME; SICHUAN; MODEL;
D O I
10.1007/s11069-021-05159-w
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
The prediction of time to slope failure (TOF) is one of the most pivotal concerns for both geological risk researchers and practitioners. Conventional inverse velocity method (IVM), based on the analysis of displacement monitoring data, has become an effective method to solve this problem because it is easy to perform and the prediction results are generally acceptable. Practically, some limitations like random instrumental noise, environmental noise, and measurement error are ubiquitous factors hampered the reliability of the prediction. In this work, traditional IVM method and modified IVM with three different filters are respectively detected on velocity time series from an landslide event in an open-pit coal mine with the propose of improving, in retrospect, the accuracy of failure predictions. Simultaneously, the effects of noise on the appraisal of IVM graphics are also assessed and explanation. The results demonstrate that the sliding process of landslides can be divided into three signature stages based on the IVM. Noteworthily, the slope failure critical point occurs at the end of the progressive stage and generally coincides with a major acceleration event in which almost integrity of the slope is lost, transitioning to a linear trend ever since. Additionally, the short-term smoothing filter (SSF) and long-term smoothing filter (LSF) models can provide more accuracy and useful information about the probable failure time. Finally, with the intention of enhancing the feasible use of the method and supporting predetermined response plans, two-level alert procedures combing SSF and LSF are proposed.
引用
收藏
页码:2819 / 2854
页数:36
相关论文
共 50 条
  • [41] A new open-pit mine planning optimization method using block aggregation and integer programming
    Mai, N. L.
    Topal, E.
    Erten, O.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2018, 118 (07) : 705 - 714
  • [42] Stability Analysis of a Large Gold Mine Open-Pit Slope Using Advanced Probabilistic Method
    Bhardwaj Pandit
    Gaurav Tiwari
    Gali Madhavi Latha
    G. L. Sivakumar Babu
    Rock Mechanics and Rock Engineering, 2018, 51 : 2153 - 2174
  • [43] Stability Analysis of a Large Gold Mine Open-Pit Slope Using Advanced Probabilistic Method
    Pandit, Bhardwaj
    Tiwari, Gaurav
    Latha, Gali Madhavi
    Babu, G. L. Sivakumar
    ROCK MECHANICS AND ROCK ENGINEERING, 2018, 51 (07) : 2153 - 2174
  • [44] Prediction of backbreak in hot strata/fiery seam of open-pit coal mine by decision tree and random forest algorithm
    Mukul Sharma
    Bhanwar Singh Choudhary
    Hemant Agrawal
    Arabian Journal of Geosciences, 2022, 15 (15)
  • [45] DEWATERING OPTIMIZATION USING A GROUNDWATER-FLOW MODEL AT THE WHITEWOOD OPEN-PIT COAL-MINE, ALBERTA
    SUMER, SM
    ELTON, JJ
    TAPICS, JA
    CANADIAN GEOTECHNICAL JOURNAL, 1988, 25 (04) : 684 - 693
  • [46] A new prediction model for rock slope failure time: a case study in West Open-Pit mine, Fushun, China
    Nie, Lei
    Li, Zechuang
    Lv, Yan
    Wang, Hongfei
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2017, 76 (03) : 975 - 988
  • [47] A new prediction model for rock slope failure time: a case study in West Open-Pit mine, Fushun, China
    Lei Nie
    Zechuang Li
    Yan Lv
    Hongfei Wang
    Bulletin of Engineering Geology and the Environment, 2017, 76 : 975 - 988
  • [48] Fusion Features-Based Entity Recognition Method for Safety Knowledge of Non-Coal Open-Pit Mine
    Ma, Ziji
    Zhao, Rui
    Huang, Jianhua
    Liu, Shicheng
    Wang, Feilong
    Shuai, Zhikang
    IEEE ACCESS, 2025, 13 : 23131 - 23141
  • [49] Recovery of level pillar between open-pit and underground mine by using underhand heading fill method
    Cai, SJ
    Zhao, H
    Ying, SJ
    JOURNAL OF UNIVERSITY OF SCIENCE AND TECHNOLOGY BEIJING, 2001, 8 (04): : 244 - 247