Analysis of transient recovery voltage and secondary arc current in transposed extra-high voltage lines in a two-phase auto-reclosing

被引:2
|
作者
Makhmudov, Karomatullo [1 ]
Krasilnikova, Tatyana [1 ]
Safaraliev, Murodbek [2 ]
Kokin, Sergey [2 ]
Ghulomzoda, Anvari [1 ]
Dmitriev, Stepan [2 ]
机构
[1] Novosibirsk State Tech Univ, Dept Automated Elect Power Syst, Novosibirsk, Russia
[2] Ural Fed Univ, Dept Automated Elect Syst, Ekaterinburg, Russia
关键词
Extra-high voltage line; Transposed line; Four-radial shunt reactors; Two-phase auto-reclosing; Transient recovery voltage; Secondary arc current; Dead time;
D O I
10.1016/j.egyr.2021.08.138
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Extra-high voltage (EHV) lines of 500-750 kV, providing transmission of electricity over long distances and at the same time performing the functions of intersystem communication at the level of the national power system, play an important role not only in normal modes, but also in emergency modes, ensuring the dynamic stability of the power system as a whole. In these lines, the overwhelming proportion of power cuts are caused by single-phase short circuits (90%), a significant part of which, being unstable arc faults, are successfully eliminated in the single-phase auto-reclosing cycle. Also, about 5%-10% of failures can be constituted by two-phase short circuits, which can be eliminated in a two-phase auto-reclosing cycle (TPhAR). The purpose of this paper is to study two-phase auto-reclosing in transposed EHV lines equipped with four-radial shunt reactors (ShR). The paper analyzes the efficiency of using a two-phase auto-reclosing to eliminate two-phase short-circuits in the lines connecting the power systems of Kyrgyzstan and Tajikistan. An algorithm is proposed for calculating the transient recovering voltages (TRV) and secondary arc currents (SAC) in the real transposed line Datka-Khujand-Dushanbe. The obtained results of TRV and SAC, which are within the permissible limits for the Dushanbe-Khujand line section, make it possible to have a dead time of TPhAR of no more than 0.6 s, in order to maintain the dynamic stability of the power system. For lines with a length of about 500 km (Datka-Khujand), equipped with three reactors, a successful TPhAR is impossible due to the appearance of resonant TRV in the circuit. The paper proposes the use of banks of capacitors connected in series in the phases of the ShR for the implementation of a successful TPhAR with the duration of the required pause of about 0.6 s. (C) 2021 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:56 / 64
页数:9
相关论文
共 38 条
  • [31] Compensating scheme for limiting secondary arc current of 1000 kV ultra-high voltage long parallel lines
    Xu, Zhengu
    Yan, Xiaoqing
    Zhang, Xu
    Wen, An
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2013, 7 (01) : 1 - 8
  • [32] Analysis of transient electromagnetic processes in the ultrahigh voltage transmission line during two-phase short circuits
    Perzynski, Tomasz
    Levoniuk, Vitaliy
    Figura, Radoslaw
    PRZEGLAD ELEKTROTECHNICZNY, 2022, 98 (12): : 294 - 297
  • [33] TRANSIENT TWO-PHASE FLOW PATTERNS BY APPLICATION OF A HIGH VOLTAGE PULSE WIDTH MODULATED SIGNAL AND THE EFFECT ON CONDENSATION HEAT TRANSFER
    Ng, K.
    Ching, C. Y.
    Cotton, J. S.
    PROCEEDINGS OF THE ASME INTERNATIONAL HEAT TRANSFER CONFERENCE - 2010, VOL 2: CONDENSATION, CONVECTION, MELTING AND SOLIDIFICATION, 2010, : 41 - 50
  • [34] Transient Two-Phase Flow Patterns by Application of a High Voltage Pulse Width Modulated Signal and the Effect on Condensation Heat Transfer
    Kevin Ng
    Ching, Chan Y.
    Cotton, James S.
    JOURNAL OF HEAT TRANSFER-TRANSACTIONS OF THE ASME, 2011, 133 (09):
  • [35] SVPWM algorithm in the scalar control structure for the three-phase voltage source inverter supplying two-phase high speed alternating current motors
    Swieboda, Pawel
    Wawro, Marcin
    PRZEGLAD ELEKTROTECHNICZNY, 2010, 86 (10): : 311 - 317
  • [36] Design and Analysis of a High-Efficiency Two-Phase Interleaved Boost Converter with Modified Conversion Ratio and Low Voltage Stress
    Biswas, Mriganka
    Majhi, Somanath
    Nemade, Harshal
    JOURNAL OF CIRCUITS SYSTEMS AND COMPUTERS, 2021, 30 (09)
  • [37] High Performance Transient Response of High/Low Pulse Voltage using Two-Phase Interleaved DC-DC Buck Converter under Half Sampling Time Deadbeat Control
    Kosode, Yoshiki
    Obara, Hidemine
    Kawamura, Atsuo
    Hosoyamada, Yu
    Suenaga, Toyoaki
    Yuzurihara, Itsuo
    IEEJ JOURNAL OF INDUSTRY APPLICATIONS, 2020, 9 (04) : 444 - 452
  • [38] Analysis on factors impacting secondary arc current in 1000 kV transmission line from Xuzhou to Nanjing and optimized calculation of grounding reactor connected to neutral of high voltage shunt reactors
    Niu, Tao
    Xie, Zhenjian
    Qian, Kang
    Xu, Wenchao
    Zhang, Yingjiao
    Dianwang Jishu/Power System Technology, 2010, 34 (11): : 12 - 17