Analysis of transient recovery voltage and secondary arc current in transposed extra-high voltage lines in a two-phase auto-reclosing

被引:2
|
作者
Makhmudov, Karomatullo [1 ]
Krasilnikova, Tatyana [1 ]
Safaraliev, Murodbek [2 ]
Kokin, Sergey [2 ]
Ghulomzoda, Anvari [1 ]
Dmitriev, Stepan [2 ]
机构
[1] Novosibirsk State Tech Univ, Dept Automated Elect Power Syst, Novosibirsk, Russia
[2] Ural Fed Univ, Dept Automated Elect Syst, Ekaterinburg, Russia
关键词
Extra-high voltage line; Transposed line; Four-radial shunt reactors; Two-phase auto-reclosing; Transient recovery voltage; Secondary arc current; Dead time;
D O I
10.1016/j.egyr.2021.08.138
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Extra-high voltage (EHV) lines of 500-750 kV, providing transmission of electricity over long distances and at the same time performing the functions of intersystem communication at the level of the national power system, play an important role not only in normal modes, but also in emergency modes, ensuring the dynamic stability of the power system as a whole. In these lines, the overwhelming proportion of power cuts are caused by single-phase short circuits (90%), a significant part of which, being unstable arc faults, are successfully eliminated in the single-phase auto-reclosing cycle. Also, about 5%-10% of failures can be constituted by two-phase short circuits, which can be eliminated in a two-phase auto-reclosing cycle (TPhAR). The purpose of this paper is to study two-phase auto-reclosing in transposed EHV lines equipped with four-radial shunt reactors (ShR). The paper analyzes the efficiency of using a two-phase auto-reclosing to eliminate two-phase short-circuits in the lines connecting the power systems of Kyrgyzstan and Tajikistan. An algorithm is proposed for calculating the transient recovering voltages (TRV) and secondary arc currents (SAC) in the real transposed line Datka-Khujand-Dushanbe. The obtained results of TRV and SAC, which are within the permissible limits for the Dushanbe-Khujand line section, make it possible to have a dead time of TPhAR of no more than 0.6 s, in order to maintain the dynamic stability of the power system. For lines with a length of about 500 km (Datka-Khujand), equipped with three reactors, a successful TPhAR is impossible due to the appearance of resonant TRV in the circuit. The paper proposes the use of banks of capacitors connected in series in the phases of the ShR for the implementation of a successful TPhAR with the duration of the required pause of about 0.6 s. (C) 2021 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:56 / 64
页数:9
相关论文
共 38 条
  • [1] Analysis of transient recovery voltage and secondary arc current in transposed extra-high voltage lines in a two-phase auto-reclosing
    Makhmudov, Karomatullo
    Krasilnikova, Tatyana
    Safaraliev, Murodbek
    Kokin, Sergey
    Ghulomzoda, Anvari
    Dmitriev, Stepan
    Energy Reports, 2021, 7 : 56 - 64
  • [2] Improvement of adaptive single-phase automatic reclosing in extra-high voltage lines
    Novosibirsk State Technical University, Department of Automated Electric Power Systems, Novosibirsk, Russia
    不详
    不详
    不详
    EPE - Proc. Int. Conf. Expo. Electr. Power Eng., (468-471):
  • [3] Detection of secondary arc extinction for adaptive single phase auto-reclosing based on local voltage behaviour
    Jamali, Sadegh
    Baayeh, Arman Ghaderi
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2017, 11 (04) : 952 - 958
  • [4] Adaptive Single-Pole Auto-Reclosing Scheme Based on Secondary Arc Voltage Harmonic Signatures
    Han, Joon
    Lee, Chul-Moon
    Kim, Chul-Hwan
    ENERGIES, 2021, 14 (05)
  • [5] Auto-reclosing scheme with adaptive dead time control for extra-high-voltage transmission line
    Patel, Ujjaval J.
    Chothani, Nilesh G.
    Bhatt, Praghnesh J.
    Tailor, Dhaval N.
    IET SCIENCE MEASUREMENT & TECHNOLOGY, 2018, 12 (08) : 1001 - 1008
  • [6] Maintaining balanced three-phase load voltage during single-phase auto-reclosing in medium voltage distribution lines
    Basu, Kartik P.
    George, Moleykutty
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2014, 8 (05) : 798 - 802
  • [7] Research on Secondary Arc Current and Recovery Voltage in UHV Lines
    Wu, Wen-hui
    Xu, Xiang-zheng
    Ye, Jin-wei
    Hu, Qiang
    PROCEEDINGS OF THE 6TH INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION, VOL 2: INNOVATION AND PRACTICE OF INDUSTRIAL ENGINEERING AND MANAGMENT, 2016, : 531 - 539
  • [8] DEVELOPMENTS OF LASER CURRENT TRANSFORMER FOR EXTRA-HIGH VOLTAGE POWER TRANSMISSION LINES
    SAITO, S
    HAMASAKI, J
    FUJII, Y
    YOKOYAMA, K
    OHNO, Y
    IEEE JOURNAL OF QUANTUM ELECTRONICS, 1967, QE 3 (06) : 266 - &
  • [9] Research on transient characteristics of secondary arc current of ultra high voltage transmission lines
    Sun, Qiuqin
    Wang, Feng
    Liu, Yang
    Zhou, Zhicheng
    Diangong Jishu Xuebao/Transactions of China Electrotechnical Society, 2016, 31 (03): : 97 - 103
  • [10] Analysis of heating defects in extension rods of extra-high voltage direct current overhead transmission lines
    Li, Xin
    Du, Lin
    Hu, Yinghua
    Xie, Huachen
    Luo, Lanyuan
    ELECTRIC POWER SYSTEMS RESEARCH, 2024, 233