Factors influencing school building construction projects abandonment

被引:10
|
作者
Damoah, Isaac Sakyi [1 ]
Tingbani, Ishmael [2 ]
Kumi, Desmond Kwadjo [3 ]
Akwei, Cyntia C. [4 ]
Amoako, Isaac Oduro [5 ]
机构
[1] Bournemouth Univ, Execut Business Ctr, Dept People & Org, Bournemouth, Dorset, England
[2] Bournemouth Univ, Execut Business Ctr, Dept Accounting, Bournemouth, Dorset, England
[3] DAL Consultancy Co Ltd, Consulting Dept, Kwabenya Accra, Ghana
[4] Liverpool John Moores Univ, Dept Doctoral Management, Redmond Bldg, Liverpool, Merseyside, England
[5] Liverpool Business Sch, Dept Business & Management, Redmonds Bldg, Liverpool, Merseyside, England
关键词
School building; construction; developing countries; public-sector projects; INTERNAL MARKET ORIENTATION; INFORMATION-SYSTEMS; MAJOR CAUSES; FAILURE; PERFORMANCE; PARTISANSHIP; DECISION; SUCCESS; ECONOMY; GHANA;
D O I
10.1080/15623599.2019.1675025
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study explores the factors that account for the abandonment of projects within the Ghanaian public education sector. The study adopted a survey of selected contractors, project management practitioners and clients in charge of the delivery of Community Day Senior High School Building projects. Employing factor analysis and structural equation modelling, the factors were categorised into five - political leadership, culture, external forces resources/funding and administrative/institutional. All these sets of elements were statistically significant in causing Ghanaian public-sector education building construction infrastructure projects abandonment. However, the most significant collections of factors are political leadership, followed by poor administrative/institutional practices, poor resource/funding, cultural factors and external forces.
引用
收藏
页码:961 / 976
页数:16
相关论文
共 50 条
  • [11] Causes of government construction projects' abandonment
    Damoah, Isaac Sakyi
    Ayakwa, Anthony
    Kumi, Desmond Kwadjo
    JOURNAL OF PROJECT MANAGEMENT, 2021, 6 (04) : 179 - 190
  • [12] Factors influencing workplace accident costs of building projects
    Peng, Yingbin
    Zhang, Shang
    Wu, Peng
    SAFETY SCIENCE, 2015, 72 : 97 - 104
  • [13] Factors influencing safety performance on construction projects: A review
    Mohammadi, Amir
    Tavakolan, Mehdi
    Khosravi, Yahya
    SAFETY SCIENCE, 2018, 109 : 382 - 397
  • [14] Influencing factors of outsourcing in construction projects: a holistic perspective
    Ma, Danfeng
    Chen, Yongqiang
    Fu, Yongcheng
    Meng, Chao
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2022, 15 (02) : 396 - 422
  • [15] Research on the Factors Influencing the Construction of Railway EPC Projects
    Kang, Jingliang
    Zheng, Hemin
    Journal of Railway Engineering Society, 2023, 40 (04) : 94 - 98
  • [16] An exploration into cost-influencing factors on construction projects
    Cheng, Ying-Mei
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (05) : 850 - 860
  • [17] Economic and Time Risk Factors Influencing the Construction Projects: A Case Study of Lebanese Construction Projects
    Ahmad, Omar
    Nouban, Fatemeh
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2023, 17 (03) : 399 - 407
  • [18] Investigation on the Factors Influencing Construction Time and Cost Overrun for High-Rise Building Projects In Penang
    Haslinda, A. Nor
    Xian, T. Wei
    Norfarahayu, K.
    Hanafi, R. Muhamad
    Fikri, H. Muhammad
    INTERNATIONAL SEMINAR ON MATHEMATICS AND PHYSICS IN SCIENCES AND TECHNOLOGY 2017 (ISMAP 2017), 2018, 995
  • [19] Critical cost factors of building construction projects in Malaysia
    Toh, Tien-Choon
    Ting, Connie
    Ali, Kherun-Nita
    Aliagha, Godwin-Uche
    Munir, Omar
    INTERNATIONAL CONFERENCE ON ASIA PACIFIC BUSINESS INNOVATION AND TECHNOLOGY MANAGEMENT, 2012, 57 : 360 - 367
  • [20] Factors Influencing Facilities Management Cost Performance in Building Projects
    Islam, Rashidul
    Nazifa, Tasnia Hassan
    Mohamed, Sarajul Fikri
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2019, 33 (03)