Mixed integer formulations for a coupled lot-scheduling and vehicle routing problem in furniture settings

被引:8
|
作者
Miranda, Pedro L. [1 ]
Morabito, Reinaldo [1 ]
Ferreira, Deisemara [2 ]
机构
[1] Univ Fed Sao Carlos, Dept Prod Engn, Sao Carlos, SP, Brazil
[2] Univ Fed Sao Carlos, Dept Phys Chem & Math, Sorocaba, Brazil
基金
巴西圣保罗研究基金会;
关键词
Production and distribution planning; production inventory distribution routing problem; production routing problem; mixed integer programming; furniture industry; LARGE NEIGHBORHOOD SEARCH; INTEGRATED PRODUCTION; SIZING PROBLEMS; INVENTORY; ALGORITHM; MODELS; LEVEL;
D O I
10.1080/03155986.2019.1575686
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
We propose and analyze two mathematical programming models for a production, inventory, distribution and routing problem considering real and relevant features from the furniture industry, such as production sequence-dependent setup times, heterogeneous fleet of vehicles, routes extending over one or more periods of the production planning horizon, multiple time windows and customers' deadlines, among others. These features are rarely jointly considered in the related literature, but commonly found in real-world applications. The models properly represent the problem in this industrial sector and can be used as a tool to support production and distribution planning in small companies. A large set of random and realistic instances is used to contrast the performance of the models in terms of both solution quality and computational effort. It is shown how much integrating production and distribution decisions in a single framework helps to reduce the total cost of the system, in comparison with a sequential approach that follows a common practice in this industry. This cost reduction comes at a higher computational effort, though.
引用
收藏
页码:563 / 596
页数:34
相关论文
共 50 条
  • [41] Linear Formulations for the Vehicle Routing Problem with Synchronization Constraints
    E. López-Aguilar
    V. Boyer
    M. A. Salazar-Aguilar
    M. Sbihi
    Journal of Computer and Systems Sciences International, 2018, 57 : 453 - 462
  • [42] Formulations and Valid Inequalities for the Heterogeneous Vehicle Routing Problem
    Hande Yaman
    Mathematical Programming, 2006, 106 : 365 - 390
  • [43] A comparative analysis of mixed-integer linear formulations for the multi-family capacitated lot-sizing problem
    Arias, Andrea L.
    Gatica, Ricardo A.
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2018, 35 (04) : 229 - 242
  • [44] Mixed-Integer Linear Programming Monolithic Formulations for Lot-Sizing and Scheduling of Single-Stage Batch Facilities
    Marchetti, Pablo A.
    Mendez, Carlos A.
    Cerda, Jaime
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2010, 49 (14) : 6482 - 6498
  • [45] The vehicle routing problem with coupled time windows
    Fügenschuh A.
    Cent. Eur. J. Oper. Res., 2006, 2 (157-176): : 157 - 176
  • [46] Mixed integer linear programming formulations for open pit production scheduling
    Askari-Nasab H.
    Pourrahimian Y.
    Ben-Awuah E.
    Kalantari S.
    Journal of Mining Science, 2011, 47 (3) : 338 - 359
  • [47] A mixed integer formulation for the offshore rig scheduling problem
    Silva, L. M. R.
    Santos, A. M. P.
    Guedes Soares, C.
    MARITIME TECHNOLOGY AND ENGINEERING 3, VOLS 1-2, 2016, : 1005 - 1011
  • [48] MIXED INTEGER LINEAR PROGRAMMING FORMULATIONS FOR OPEN PIT PRODUCTION SCHEDULING
    Askari-Nasab, H.
    Pourrahimian, Y.
    Ben-Awuah, E.
    Kalantari, S.
    JOURNAL OF MINING SCIENCE, 2011, 47 (03) : 338 - 359
  • [49] FLEXIBLE MIXED-INTEGER PROGRAMMING FORMULATIONS FOR PRODUCTION SCHEDULING PROBLEMS
    BRUVOLD, NT
    EVANS, JR
    IIE TRANSACTIONS, 1985, 17 (01) : 2 - 7
  • [50] An Integer Programming Model for the Capacitated Vehicle Routing Problem with Drones
    Wikarek, Jaroslaw
    Sitek, Pawel
    Zawarczynski, Lukasz
    COMPUTATIONAL COLLECTIVE INTELLIGENCE, PT I, 2019, 11683 : 511 - 520