共 50 条
- [42] The performance of the integrated rural development program in India: An assessment DEVELOPING ECONOMIES, 1998, 36 (02): : 117 - 131
- [43] Development of an integrated total quality management and performance measurement system for self-assessment: A method TOTAL QUALITY MANAGEMENT, 2002, 13 (06): : 759 - 777
- [45] AN INTEGRATED PERFORMANCE MEASURE APPROACH FOR SYSTEM RELIABILITY ASSESSMENT PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, 2014, VOL 2B, 2014,
- [48] The integrated development and environmental additionality assessment system (IDEAAS) NEW AND RENEWABLE ENERGY TECHNOLOGIES FOR SUSTAINABLE DEVELOPMENT, 2004, : 3 - 24
- [49] INTEGRATED SYSTEM ARCHITECTURE DEVELOPMENT FRAMEWORK AND COMPLEXITY ASSESSMENT PROCEEDINGS OF ASME 2021 INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION (IMECE2021), VOL 9, 2021,