Simulation-Based Positioning of Circular Economy Manager's Skills in Construction Projects

被引:9
|
作者
Gorecki, Jaroslaw [1 ]
机构
[1] UTP Univ Sci & Technol, Fac Civil & Environm Engn & Architecture, Prof S Kaliskiego 7, PL-85796 Bydgoszcz, Poland
来源
SYMMETRY-BASEL | 2020年 / 12卷 / 01期
关键词
circular economy; selection process; construction project; management; Monte Carlo; ANALYTIC NETWORK PROCESS; SUSTAINABLE PRODUCTION SYSTEMS; COMPETENCE-BASED SELECTION; HUMAN-RESOURCES; SUPPORT-SYSTEM; MCDM APPROACH; PERSONNEL; INDUSTRY; FRAMEWORK; WASTE;
D O I
10.3390/sym12010050
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Circular economy (CE) is an emerging economic model based on the endless circulation flow of resources creating additional value. In temporary organizations such as construction projects, all administrative decisions are crucial for final success. One of the ideas is to enroll a circular economy manager (CEMR) and put him in an organizational structure. Implementation of the CE concept should be the effort of the entire project team. However, actions specific to the innovative nature of the procedures related to the CE in construction projects require additional support. It can be provided by professionals who can adapt a wide spectrum of knowledge to be used for promoting CE in the execution of construction processes. CEMRs can play the role of patrons of the CE issues because they support project managers in saving material resources in construction projects. The symmetry between visible outcomes of the CE idea and the employment of an extra manager has contributed to the development of the CEMR selection criteria model. However, effective recruitment for such a post may be a bit complicated for decision-makers, especially when CE is still enigmatic, as its procedures are quite undiscovered. All in all, the multi-criteria decision-making problem forces one to prepare the list of selection criteria and to rank them according to status in the hierarchy. This article shows prioritized criteria for selecting the CEMR based on the advanced literature review concluded after several expert-based reviews and calculated after some Monte Carlo simulations. The main purpose of this article is to help decision-makers in construction projects to perform a reliable recruitment process.
引用
收藏
页数:25
相关论文
共 50 条
  • [31] Analysis of Claims Related to the Employer's Project Manager in Construction Projects
    Pouyanrad, Elahe
    Parchamijalal, Majid
    [J]. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 2025, 17 (01)
  • [32] The effect of simulation-based flipped classroom on acquisition of cardiopulmonary resuscitation skills: A simulation-based randomized trial
    Hassan, Eman Arafa
    Elsaman, Suad Elsayed Abdelmotalb
    [J]. NURSING IN CRITICAL CARE, 2023, 28 (03) : 344 - 352
  • [33] Construction Project Management Based on the Circular Economy
    Bondar, Olena
    Petrenko, Ganna
    Khalilov, Arzu
    Vahonova, Oleksandra
    Akimova, Liudmyla
    Akimov, Oleksandr
    [J]. INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2022, 22 (09): : 630 - 635
  • [34] Facilitating a transition to a circular economy in construction projects: intermediate theoretical models based on the theory of planned behaviour
    Adabre, Michael Atafo
    Chan, Albert P. C.
    Darko, Amos
    Hosseini, Mohammad Reza
    [J]. BUILDING RESEARCH AND INFORMATION, 2023, 51 (01): : 85 - 104
  • [35] Facilitating a transition to a circular economy in construction projects: intermediate theoretical models based on the theory of planned behaviour
    Adabre, Michael Atafo
    Chan, Albert P. C.
    Darko, Amos
    Hosseini, Mohammad Reza
    [J]. JOURNAL OF PLANNING LITERATURE, 2023, 38 (04) : 603 - 603
  • [36] Circular economy and life cycle assessment of alumina production: Simulation-based comparison of Pedersen and Bayer processes
    Ma, Yan
    Preveniou, Athina
    Kladis, Anastasios
    Pettersen, Johan Berg
    [J]. JOURNAL OF CLEANER PRODUCTION, 2022, 366
  • [37] TIME-STEPPED, SIMULATION-BASED SCHEDULING SYSTEM FOR LARGE-SCALE INDUSTRIAL CONSTRUCTION PROJECTS
    Hu, Di
    Mohamed, Yasser
    [J]. 2013 WINTER SIMULATION CONFERENCE (WSC), 2013, : 3249 - 3256
  • [38] A conceptual approach in developing a project manager's skills framework (PMSF) for improving the performance of complex projects in Kuwait construction industry
    Alshammari, Faisal
    Yahya, Khairulzan
    Haron, Zaiton
    [J]. 4TH INTERNATIONAL CONFERENCE ON CONSTRUCTION AND BUILDING ENGINEERING & 12TH REGIONAL CONFERENCE IN CIVIL ENGINEERING (ICONBUILD & RCCE 2019), 2020, 849
  • [39] Improving Telenursing Skills Through Simulation-Based Education
    Parmeter, Sandra
    Foronda, Cynthia
    Lee, Jiye
    [J]. JOURNAL OF DOCTORAL NURSING PRACTICE, 2023, 16 (02) : 93 - 101
  • [40] Reliability of Simulation-Based Assessment of Surgical Technical Skills
    Campioni-Norman, D.
    Mavroveli, S.
    Boshier, P.
    Hanna, G.
    [J]. BRITISH JOURNAL OF SURGERY, 2024, 111