共 50 条
- [41] Evaluation of punctuality on a heavily utilised railway line with mixed traffic COMPUTERS IN RAILWAYS XI: COMPUTER SYSTEM DESIGN AND OPERATION IN THE RAILWAY AND OTHER TRANSIT SYSTEMS, 2008, 103 : 545 - 553
- [42] CENTRALIZED TRAFFIC CONTROL OF UNDERGROUND RAILWAY OF ROME - LINE-A ELETTROTECNICA, 1977, 64 (01): : 11 - 17
- [43] Maintenance and recovery of bridges and tunnels in a freight traffic railway line ADVANCES IN ENGINEERING MATERIALS, STRUCTURES AND SYSTEMS: INNOVATIONS, MECHANICS AND APPLICATIONS, 2019, : 1831 - 1836
- [45] Construction of the railway superstructure of the Rome-Naples high speed line - Organization and material logistic Ingegneria Ferroviaria, 2003, 58 (10): : 895 - 902
- [46] VINKOVCI - VUKOVAR RAILWAY MODERNIZATION PROJECT Modernized Vinkovci - Vukovar railway line opened to traffic GRADEVINAR, 2025, 77 (01): : 79 - 82
- [48] VIBRATIONS FROM RAIL TRAFFIC AND MITIGATIONS MEASURES FOR THE REDUCTION OF RAILWAY NOISE PROCEEDINGS OF THE 22ND INTERNATIONAL CONGRESS ON SOUND AND VIBRATION: MAJOR CHALLENGES IN ACOUSTICS, NOISE AND VIBRATION RESEARCH, 2015, 2015,
- [49] An Example of Vibration and Low Frequency Noise Assessment for Railway Line ACOUSTICS AND VIBRATION OF MECHANICAL STRUCTURES (AVMS-2017), 2018, 198 : 219 - 226
- [50] Optimal model of regional traffic signal control under mixed traffic flow condition Jiaotong Yunshu Gongcheng Xuebao/Journal of Traffic and Transportation Engineering, 2015, 15 (01): : 119 - 126