共 50 条
- [43] HANDLING AND SHIPPING OF LONG SPAN BRIDGE BEAMS JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1987, 32 (06): : 86 - 101
- [44] Pushover Analysis of Long Span Bridge Bents TRANSPORT MEANS 2008, PROCEEDINGS, 2008, : 176 - 180
- [45] Dynamic monitoring of a long span arch bridge ENGINEERING STRUCTURES, 2008, 30 (11) : 3034 - 3044
- [46] USE OF CONCRETE IN THE ANNACIS BRIDGE MAIN SPAN JOURNAL OF THE AMERICAN CONCRETE INSTITUTE, 1986, 83 (05): : 887 - 888
- [49] Finite element modeling of a six span bridge NONDESTRUCTIVE EVALUATION OF HIGHWAYS, UTILITIES, AND PIPELINES IV, 2000, 3995 : 136 - 145
- [50] REVIEW OF SMALL SPAN BRIDGE DESIGN AND STANDARDISATION JOURNAL OF THE INSTITUTION OF HIGHWAY ENGINEERS, 1971, 18 (03): : 37 - &