Manufacturing System Upgrade with Wireless and Distributed Automation

被引:8
|
作者
Grohn, Laura [1 ]
Metsala, Samuli [1 ]
Nyholm, Magnus [1 ]
Saikko, Lauri [1 ]
Vaananen, Eero [1 ]
Gulzar, Kashif [1 ]
Vyatkina, Valeriy [1 ,2 ]
机构
[1] Aalto Univ, Sch Elect Engn & Automat, Espoo 02150, Finland
[2] Lulea Univ Technol, Dept Comp Sci Elect & Space Engn, S-97187 Lulea, Sweden
关键词
Distributed automation; IEC; 61499; dynamic software updates; wireless networking; flexibility;
D O I
10.1016/j.promfg.2017.07.207
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents a case study of developing a distributed factory automation system model upgrade with decentralized control deployed on a network of six programmable automation controllers communicating wirelessly. The goal is to develop a distributed system which is flexible enough, and easier to reconfigure with on-the-fly online software updates in a smart factory automation environment. Our approach benefits mainly production industries which require a robust and modular software design requiring less effort for their production line. The developed solution aims at flexibility, re-configurability, ease of maintenance and reduced downtime costs. (C) 2017 Published by Elsevier B.V.
引用
收藏
页码:1012 / 1018
页数:7
相关论文
共 50 条
  • [21] DESIGN METHODOLOGY FOR MANUFACTURING AUTOMATION SYSTEM RECONFIGURATION
    Rahman, Muhamad Arfauz A.
    Mo, John P. T.
    PROCEEDINGS OF THE ASME INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION 2010, VOL 3, PTS A AND B, 2012, : 429 - 438
  • [22] The 50cm Robotic Telescope: Control System Upgrade and Automation
    Stanzin, Tsewang
    Jorphail, Sonam
    Parihar, Padmakar
    Angchuk, Dorje
    Dorjai, Tsewang
    Gyalson, Tsewang
    Mahey, Tashi Thsering
    Dorjay, Padma
    Dorjay, Phuntsok
    Phunchok, Tsewang
    Pamber, Tashi
    Stanzin, Urgain
    Angdu, Skalzang
    GROUND-BASED AND AIRBORNE TELESCOPES IX, 2022, 12182
  • [23] Distributed Multi-robot Work Load Partition In Manufacturing Automation
    Tewolde, Girma S.
    Wu, Changhua
    Wang, Yu
    Sheng, Weihua
    2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, VOLS 1 AND 2, 2008, : 504 - +
  • [24] JET FIR Interferometer laser operation and interlock system upgrade to an open automation system
    Boboc, Alexandru
    Trimble, Paul
    Jones, Graham
    Fessey, John
    Cramp, Simon
    Studholme, Will
    FUSION ENGINEERING AND DESIGN, 2019, 146 : 835 - 838
  • [25] Distributed Intelligent Automation Solutions for Self-adaptive Manufacturing Plants
    Brusaferri, Alessandro
    Ballarino, Andrea
    Carpanzano, Emanuele
    BALANCED AUTOMATION SYSTEMS FOR FUTURE MANUFACTURING NETWORKS, 2010, 322 : 205 - 213
  • [26] Application of wireless networks in substation automation system
    Yan, Jun
    Liu, Pei
    Miao, Shi-Hong
    Dianli Zidonghua Shebei / Electric Power Automation Equipment, 2005, 25 (04): : 74 - 75
  • [29] Wireless Industrial Tracking System for Factory Automation
    Chan, Hing Kai
    2008 INTERNATIONAL SYMPOSIUM ON INTELLIGENT INFORMATION TECHNOLOGY APPLICATION, VOL III, PROCEEDINGS, 2008, : 862 - 866
  • [30] Wireless Communication System Automation Testing Framework
    Liu, Lan
    Wei, Wenguo
    Li, Jiachun
    2007 INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-15, 2007, : 2981 - +