In situ remediation life-cycle cost vs. substrate cost

被引:0
|
作者
Wilson, Scott B.
机构
来源
关键词
D O I
暂无
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
引用
收藏
页码:143 / 143
页数:1
相关论文
共 50 条
  • [31] WARRANTY PRICING WITH A LIFE-CYCLE COST MODEL
    ROTZ, AO
    PROCEEDINGS ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 1986, (SYM): : 454 - 456
  • [32] Life-cycle cost management of concrete bridges
    So, K. K. L.
    Cheung, M. M. S.
    Zhang, E. X. Q.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2009, 162 (03) : 103 - 117
  • [33] Life-cycle cost design methods and tools
    Pulakka, S
    DURABILITY OF BUILDING MATERIALS AND COMPONENTS 8, VOLS 1-4, PROCEEDINGS, 1999, : 2710 - 2715
  • [34] SUPPORT SYSTEM LIFE-CYCLE COST MODEL
    BROOK, C
    BARASIA, R
    PROCEEDINGS ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 1977, (NSYM): : 297 - 302
  • [35] DEVELOPMENT OF A LIFE-CYCLE MANAGEMENT COST MODEL
    BARASIA, RK
    KIANG, TD
    PROCEEDINGS ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 1978, (NSYM): : 254 - 259
  • [36] A bridge life-cycle cost optimization methodology
    Almeida, J. O.
    Delgado, R. M.
    Teixeira, P. F.
    LIFE-CYCLE OF ENGINEERING SYSTEMS: EMPHASIS ON SUSTAINABLE CIVIL INFRASTRUCTURE, 2017, : 1103 - 1110
  • [37] CONTRACTORS PERCEPTION OF DESIGN TO LIFE-CYCLE COST
    ADEL, RE
    MERLINO, FX
    IEEE TRANSACTIONS ON AEROSPACE AND ELECTRONIC SYSTEMS, 1977, 13 (04) : 443 - 443
  • [38] A LIFE-CYCLE COST VIEWPOINT OF SOFTWARE MAINTAINABILITY
    SOI, IM
    AGGARWAL, KK
    COMPUTERS & ELECTRICAL ENGINEERING, 1981, 8 (04) : 277 - 282
  • [39] Optimizing the Life-Cycle Cost of Human Capital
    Cunic, Bradley K.
    POWER, 2009, 153 (09) : 64 - 66
  • [40] Life-Cycle Cost tenders for infrastructure projects
    Bakker, Jaap
    Volwerk, Joris
    LIFE-CYCLE COST AND PERFORMANCE OF CIVIL INFRASTRUCTURE SYSTEMS, 2007, : 103 - 110