共 50 条
- [44] A Z-NUMBER EXTENSION OF THE HYBRID ANALYTIC HIERARCHY PROCESS - FUZZY DATA ENVELOPMENT ANALYSIS FOR RISK ASSESSMENT [J]. 2015 INTERNATIONAL CONFERENCE ON RESEARCH AND EDUCATION IN MATHEMATICS (ICREM7), 2015, : 19 - 24
- [47] Risk Analysis in Manufacturing Processes: An Integrated Approach Using the FMEA Method [J]. ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: SMART MANUFACTURING AND LOGISTICS SYSTEMS: TURNING IDEAS INTO ACTION, APMS 2022, PT I, 2022, 663 : 260 - 266
- [49] A comprehensive mortise and tenon structure selection method based on Pugh's controlled convergence and rough Z-number MABAC method [J]. PLOS ONE, 2023, 18 (05):