The significance of financial risks in BOT procurement

被引:26
|
作者
Lam, KC [1 ]
Chow, WS
机构
[1] City Univ Hong Kong, Dept Bldg & Construct, Tat Chee Ave, Kowloon, Peoples R China
[2] Hong Kong Int Airport, Airport Author Hong Kong, Lantau, Peoples R China
来源
BUILDING RESEARCH AND INFORMATION | 1999年 / 27卷 / 02期
关键词
financial risk; Build-Operate-Transfer projects; risk analysis; procurement; private finance; Hong Kong;
D O I
10.1080/096132199369552
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper explores the significance of the financial risk characteristics of Build-Operate-Transfer (BOT) projects. The objective was to identify and discuss the significance of the types of financial risk variables in conjunction with the different phases of procurement. A survey was therefore conducted to investigate the nature of the relationships between the financial risk variables and the different phases of BOT projects. 'Interest rate fluctuation' was the most significant financial risk variable in the pre-investment phase. For the implementation phase, both the variables 'design deficiency' and 'time overrun' were found to be highly statistically significant. The variable 'time overrun' was found to be the most statistically significant in the construction phase. The majority of the risk variables were considered to be moderately significant in the operations phase; these included 'competition', 'currency exchange restrictions' and 'defective products or facilities'. A mathematical model employing discriminant analysis was established to demonstrate the classification of financial risk variables in relation to the five BOT project phases.
引用
收藏
页码:84 / 95
页数:12
相关论文
共 50 条
  • [1] BOT financial risks and its precautions
    Huang Changjiang
    Luo Lingyan
    [J]. Proceedings of 2005 International Conference on Innovation & Management, 2005, : 454 - 456
  • [2] Investigating the significance of risks in BOT transportation projects in Vietnam
    Phuong Thi Le
    Chileshe, Nicholas
    Kirytopoulos, Konstantinos
    Rameezdeen, Raufdeen
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (06) : 1401 - 1425
  • [3] Role of Financial Risks in BOT Megatransportation Projects in Developing Countries
    Aladag, Hande
    Isik, Zeynep
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (04)
  • [4] BOT risks and their correlations
    Öztemir, B
    Weber, S
    [J]. CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 837 - 846
  • [5] RISKS AND GUARANTEES IN BOT TENDER
    TIONG, RLK
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (02): : 183 - 188
  • [6] Financial commitments for BOT projects
    Nanyang Technological Univ, Singapore
    [J]. Int J Proj Manage, 2 (73-78):
  • [7] QUANTITATIVE APPROACH TO PROCUREMENT RISKS
    HWANG, JD
    WONG, JT
    MARSHALL, CW
    [J]. OPERATIONS RESEARCH, 1975, 23 : B273 - B273
  • [8] THE RISKS OF PUBLIC PROCUREMENT IN ROMANIA
    Preda, Ionel
    Simion, Cezar-Petre
    [J]. PROCEEDINGS OF THE 13TH INTERNATIONAL MANAGEMENT CONFERENCE: MANAGEMENT STRATEGIES FOR HIGH PERFORMANCE (IMC 2019), 2019, : 133 - 141
  • [9] Impact of supply risks on procurement decisions
    Shanshan Guo
    Lei Zhao
    Xiaowei Xu
    [J]. Annals of Operations Research, 2016, 241 : 411 - 430
  • [10] THE SIGNIFICANCE OF TRANSPARENCY IN ELECTRONIC PROCUREMENT
    Delina, Radoslav
    Sukker, Abdalla Ahmed M.
    [J]. IDIMT-2015: INFORMATION TECHNOLOGY AND SOCIETY INTERACTION AND INTERDEPENDENCE, 2015, 44 : 237 - 246