共 50 条
- [31] Global path planning on board the mars exploration rovers [J]. 2007 IEEE AEROSPACE CONFERENCE, VOLS 1-9, 2007, : 9 - +
- [32] Mars exploration rovers orbit determination system modeling [J]. JOURNAL OF THE ASTRONAUTICAL SCIENCES, 2006, 54 (02): : 175 - 197
- [34] High gain antenna pointing on the Mars Exploration Rovers [J]. INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS, VOL 1-4, PROCEEDINGS, 2005, : 28 - 33
- [35] Operational modification of the Mars Exploration Rovers' Flight Software [J]. INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS, VOL 1-4, PROCEEDINGS, 2005, : 8 - 13
- [36] Lightweight rovers for Mars science exploration and sample return [J]. INTELLIGENT ROBOTS AND COMPUTER VISION XVI: ALGORITHMS, TECHNIQUES, ACTIVE VISION, AND MATERIALS HANDLING, 1997, 3208 : 24 - 36
- [37] Mars exploration rovers orbit determination filter strategy [J]. Collect. Tech. Pap. AIAA AAS Astrodynamics Spec. Conf., (537-564):
- [38] "Follow the Water": Steve Squyres and the Mars Exploration Rovers [J]. JOURNAL OF THE FRANKLIN INSTITUTE-ENGINEERING AND APPLIED MATHEMATICS, 2011, 348 (03): : 446 - 452