共 50 条
- [22] The state of the art in simulation study on FMS scheduling: A comprehensive survey [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2002, 19 (11): : 830 - 849
- [23] Impact of dispatching and routing flexibility on the performance of an FMS - a simulation study [J]. ADVANCED MANUFACTURING PROCESSES, SYSTEMS, AND TECHNOLOGIES (AMPST 99), 1999, : 91 - +
- [25] The State of the Art in Simulation Study on FMS Scheduling: A Comprehensive Survey [J]. The International Journal of Advanced Manufacturing Technology, 2002, 19 : 830 - 849
- [26] The BITE unit - A data sharing infrastructure and simulation integration tool [J]. PROCEEDINGS OF THE 1998 SUMMER COMPUTER SIMULATION CONFERENCE: SIMULATION AND MODELING TECHNOLOGY FOR THE TWENTY-FIRST CENTURY, 1998, : 678 - 683
- [27] Selection of a Machine Tool for FMS Using ELECTRE III - A Case Study [J]. 2009 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, 2009, : 171 - +
- [29] DEVELOPMENT OF THE ROBOT SIMULATION IN FMS [J]. IFIP TRANSACTIONS B-APPLICATIONS IN TECHNOLOGY, 1992, 1 : 173 - 178
- [30] The Research of FMS Scheduling and Simulation [J]. MACHINERY, MATERIALS SCIENCE AND ENGINEERING APPLICATIONS, 2012, 510 : 70 - +