Minimizing energy consumption in a U-shaped robotic assembly line

被引:0
|
作者
Nilakantan, J. Mukund [1 ]
Ponnambalam, S. G. [1 ,2 ]
Huang, George Q. [3 ]
机构
[1] Monash Univ Malaysia, Sch Engn, Subang Jaya 46150, Selangor, Malaysia
[2] Monash Univ Malaysia, Adv Engn Platform, Subang Jaya 46150, Selangor, Malaysia
[3] Univ Hong Kong, Dept Ind & Mfg Syst Engn, Hong Kong, Hong Kong, Peoples R China
关键词
BALANCING PROBLEM; MODEL; ALGORITHM;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Manufacturing industries these days are more concerned about the energy consumption due to the increasing energy cost. It is observed that industries can achieve significant savings in the energy cost even when a small percentage of energy consumption is reduced. In a manufacturing industry, assembly fines are equipped with robots to perform the assembly tasks and there is a need for efficiently balancing the assembly line by reducing the energy consumption during the production phase. The authors could not find any research on optimizing enerp, consumption in U-shaped robotic assembly line systems to date. The objective of this paper is to propose an optimization models with an objective of minimizing the energy consumption in a U-shaped robotic assembly line when the number of workstations are fixed. Since the assembly line balancing problems falls under the category of NP-hard, an efficient bio inspired algorithm is implemented to solve the problem. The model proposed is very well applicable for automobile assembly line where robots are employed. The energy consumption is evaluated on the benchmark data and energy consumption obtained by the U-shaped robotic assembly line is compared with the energy consumption obtained with straight robotic assembly line. The cycle time of the layouts are also compared. The results obtained using this proposed model can be used for the decision making process in the industry. The paper also proposes an optimization model for minimizing the cycle time. The energy consumption of the assembly line when the cycle time is minimized is evaluated and presented.
引用
收藏
页码:119 / 124
页数:6
相关论文
共 50 条
  • [21] Branch, bound and remember algorithm for U-shaped assembly line balancing problem
    Li, Zixiang
    Kucukkoc, Ibrahim
    Zhang, Zikai
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 124 : 24 - 35
  • [22] U-shaped assembly line balancing of light airplane based on capacity factor
    Wang G.
    Yang Y.
    Lyu S.
    Wang W.
    Xiong X.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2018, 24 (03): : 612 - 619
  • [23] A heuristic approach for U-shaped assembly line balancing to improve labor productivity
    Avikal, Shwetank
    Jain, Rajeev
    Mishra, P. K.
    Yadav, H. C.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 64 (04) : 895 - 901
  • [24] A NEW ALGORITHM FOR U-SHAPED TWO-SIDED ASSEMBLY LINE BALANCING
    Yegul, Mustafa Fatih
    Agpak, Kursad
    Yavuz, Mustafa
    TRANSACTIONS OF THE CANADIAN SOCIETY FOR MECHANICAL ENGINEERING, 2010, 34 (02) : 225 - 241
  • [25] THE IMPACT OF WALKING TIME ON U-SHAPED ASSEMBLY LINE WORKER ALLOCATION PROBLEMS
    Sirovetnukul, Ronnachai
    Chutima, Parames
    ENGINEERING JOURNAL-THAILAND, 2010, 14 (02): : 53 - 78
  • [26] Models and algorithms for U-shaped assembly line balancing problem with collaborative robots
    Zixiang Li
    Mukund Janardhanan
    Qiuhua Tang
    Zikai Zhang
    Soft Computing, 2023, 27 : 9639 - 9659
  • [27] Balancing of parallel U-shaped assembly lines
    Kucukkoc, Ibrahim
    Zhang, David Z.
    COMPUTERS & OPERATIONS RESEARCH, 2015, 64 : 233 - 244
  • [28] Application of Particle Swarm Optimization to Maximize Efficiency of Straight and U-Shaped Robotic Assembly Lines
    Janardhanan, Mukund Nilakantan
    Nielsen, Peter
    Ponnambalam, S. G.
    DISTRIBUTED COMPUTING AND ARTIFICIAL INTELLIGENCE, (DCAI 2016), 2016, 474 : 525 - 533
  • [29] Random double U-shaped assembly line balancing method using priority value
    Jiao Y.-L.
    Li M.-J.
    Wang Z.-Z.
    Jin H.-Q.
    Yang Z.-W.
    Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2020, 50 (06): : 2087 - 2093
  • [30] Modeling and balancing of parallel U-shaped assembly line based on improved genetic algorithms
    Jiao, Yu-ling
    Huang, Lujiao
    Xu, Binjie
    Wang, Yang
    Su, Xinyue
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2024, 238 (13) : 1991 - 2000