Minimizing energy consumption in a U-shaped robotic assembly line

被引:0
|
作者
Nilakantan, J. Mukund [1 ]
Ponnambalam, S. G. [1 ,2 ]
Huang, George Q. [3 ]
机构
[1] Monash Univ Malaysia, Sch Engn, Subang Jaya 46150, Selangor, Malaysia
[2] Monash Univ Malaysia, Adv Engn Platform, Subang Jaya 46150, Selangor, Malaysia
[3] Univ Hong Kong, Dept Ind & Mfg Syst Engn, Hong Kong, Hong Kong, Peoples R China
关键词
BALANCING PROBLEM; MODEL; ALGORITHM;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Manufacturing industries these days are more concerned about the energy consumption due to the increasing energy cost. It is observed that industries can achieve significant savings in the energy cost even when a small percentage of energy consumption is reduced. In a manufacturing industry, assembly fines are equipped with robots to perform the assembly tasks and there is a need for efficiently balancing the assembly line by reducing the energy consumption during the production phase. The authors could not find any research on optimizing enerp, consumption in U-shaped robotic assembly line systems to date. The objective of this paper is to propose an optimization models with an objective of minimizing the energy consumption in a U-shaped robotic assembly line when the number of workstations are fixed. Since the assembly line balancing problems falls under the category of NP-hard, an efficient bio inspired algorithm is implemented to solve the problem. The model proposed is very well applicable for automobile assembly line where robots are employed. The energy consumption is evaluated on the benchmark data and energy consumption obtained by the U-shaped robotic assembly line is compared with the energy consumption obtained with straight robotic assembly line. The cycle time of the layouts are also compared. The results obtained using this proposed model can be used for the decision making process in the industry. The paper also proposes an optimization model for minimizing the cycle time. The energy consumption of the assembly line when the cycle time is minimized is evaluated and presented.
引用
收藏
页码:119 / 124
页数:6
相关论文
共 50 条
  • [1] Modelling and optimisation of energy-efficient U-shaped robotic assembly line balancing problems
    Zhang, Zikai
    Tang, Qiuhua
    Li, Zixiang
    Zhang, Liping
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (17) : 5520 - 5537
  • [2] Robotic U-shaped assembly line balancing using particle swarm optimization
    Nilakantan, J. Mukund
    Ponnambalam, S. G.
    ENGINEERING OPTIMIZATION, 2016, 48 (02) : 231 - 252
  • [3] Simulation-based Assembly Line Balancing in U-shaped, Parallel U-shaped, and Parallel Adjacent U-shaped Layouts
    Doung, P.
    Sirovetnukul, R.
    Ren, J.
    2020 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2020, : 751 - 755
  • [4] U-SHAPED ASSEMBLY LINE BALANCING WITH TEMPORARY WORKERS
    Nakade, Koichi
    Ito, Akiyasu
    Ali, Syed Mithun
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2015, 22 (01): : 134 - 146
  • [5] Optimizing the Efficiency of Straight and U-Shaped Robotic Assembly Lines
    Nilakantan, J. Mukund
    Ponnambalam, S. G.
    SWARM, EVOLUTIONARY, AND MEMETIC COMPUTING, SEMCCO 2014, 2015, 8947 : 582 - 595
  • [6] Mathematical models and migrating birds optimization for robotic U-shaped assembly line balancing problem
    Li, Zixiang
    Janardhanan, Mukund Nilakantan
    Ashour, Amira S.
    Dey, Nilanjan
    NEURAL COMPUTING & APPLICATIONS, 2019, 31 (12): : 9095 - 9111
  • [7] Mathematical models and migrating birds optimization for robotic U-shaped assembly line balancing problem
    Zixiang Li
    Mukund Nilakantan Janardhanan
    Amira S. Ashour
    Nilanjan Dey
    Neural Computing and Applications, 2019, 31 : 9095 - 9111
  • [8] Minimizing energy consumption in a straight robotic assembly line using differential evolution algorithm
    Janardhanan, Mukund Nilakantan
    Nielsen, Peter
    Li, Zixiang
    Ponnambalam, S. G.
    DISTRIBUTED COMPUTING AND ARTIFICIAL INTELLIGENCE, 2018, 620 : 45 - 52
  • [9] An investigation on minimizing cycle time and total energy consumption in robotic assembly line systems
    Nilakantan, J. Mukund
    Huang, George Q.
    Ponnambalam, S. G.
    JOURNAL OF CLEANER PRODUCTION, 2015, 90 : 311 - 325
  • [10] U-shaped assembly line balancing problem with genetic algorithm
    Hwang, Rea Kook
    Katayama, Hiroshi
    Gen, Mitsuo
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (16) : 4637 - 4649