Influence of Pier Settlement on Structural Stress of Longitudinal Connected Track in High-Speed Railways

被引:4
|
作者
Fang, Hui [1 ]
机构
[1] State Grid Chongqing Elect Power Res Inst, Chongqing, Peoples R China
关键词
SLAB TRACK; VEHICLE; SYSTEM; MODEL;
D O I
10.1155/2020/8102637
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Pier settlement is unavoidable in the construction and operation of high-speed railways. This paper presents a work on the influence of pier settlement on additional structural stress of longitudinal connected track (LCT). First of all, the generation mechanism of additional structural stress of LCT caused by pier settlement is described in detail. On this basis, the deformation of LCT caused by pier settlement is analytically deduced and a dynamic model of high-speed train-LCT-bridge coupled system considering pier settlement is established based on the train-track-bridge dynamic interaction theory, adopting which the additional structural stresses of LCT are discussed from static and dynamic perspectives. Results show that pier settlement has a great influence on the stability of LCT. Additional tensile stresses of LCT appear at settlement pier location and two adjacent pier locations. Tensile stresses on top surface of slab and on bottom surface of base should be paid attention to. The behaviors of LCT at adjacent pier locations cannot be ignored in studying the influence of pier settlement on the system. To ensure the stability of LCT and running performance of train, the control value of pier settlement is suggested to be 10.5mm from the static and dynamic perspectives in practical engineering.
引用
收藏
页数:12
相关论文
共 50 条
  • [31] Effect of Bridge-Pier Differential Settlement on the Dynamic Response of a High-Speed Railway Train-Track-Bridge System
    Zhang, Xiaohui
    Shan, Yao
    Yang, Xinwen
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2017, 2017
  • [32] Shear behavior of stud connectors in steel bridge deck and ballastless track structural systems of high-speed railways
    Cui, Chenxing
    Song, Li
    Liu, Ran
    Liu, Hubing
    Yu, Zhiwu
    Jiang, Lizhong
    CONSTRUCTION AND BUILDING MATERIALS, 2022, 341
  • [33] Effects of Vehicle and Track Key Parameters on the Rail Corrugation of High-speed Railways
    Jiang Z.
    Zhao G.
    Zhang H.
    Wu L.
    Wen Z.
    Wang H.
    Wang, Hengyu (hywang@home.swjtu.edu.cn), 2018, Chinese Mechanical Engineering Society (54): : 57 - 63
  • [34] Condition Monitoring and Preventive Maintenance of Ballastless Track Systems for High-speed Railways
    Liu D.
    Huang X.
    Zhongguo Jixie Gongcheng/China Mechanical Engineering, 2019, 30 (03): : 349 - 353
  • [35] Radiative cooling for thermal management of ballastless track slab in high-speed railways
    Huang, Shuai
    You, Tian
    Xie, Yudong
    APPLIED ENERGY, 2025, 382
  • [36] Experiment, Optimization, and Design of Electromagnetic Track Brake for High-Speed Railways System
    Xiang, Chun
    Wang, Jun-Cheng
    Gu, Yu-Feng
    Zhang, Shi-Jin
    Chen, Shi-An
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020 : 1 - 11
  • [37] Optimal design and application of geogrid for ballasted track stabilization in high-speed railways
    Luo, Zheng
    Liu, Shun
    Bian, Xuecheng
    Zhao, Chuang
    Chen, Yunmin
    GEOTEXTILES AND GEOMEMBRANES, 2025, 53 (03) : 754 - 766
  • [38] Evolution and formation mechanism of rail corrugation in high-speed railways involving the longitudinal wheel-track coupling relationship
    Shen, YiZhe
    Zhu, ShengYang
    Yang, JianJin
    Zhai, WanMing
    SCIENCE CHINA-TECHNOLOGICAL SCIENCES, 2024, 67 (11) : 3612 - 3625
  • [39] Evolution and formation mechanism of rail corrugation in high-speed railways involving the longitudinal wheel-track coupling relationship
    SHEN YiZhe
    ZHU ShengYang
    YANG JianJin
    ZHAI WanMing
    Science China(Technological Sciences), 2024, 67 (11) : 3612 - 3625
  • [40] DYNAMIC ASSESSMENT OF BALLASTLESS TRACK STIFFNESS AND SETTLEMENT IN HIGH-SPEED RAILWAY
    Wang, P.
    Chen, R.
    Chen, X. P.
    PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, VOL 1: RAILROAD INFRASTRUCTURE ENGINEERING SAFETY, SECURITY AND ENVIRONMENT, 2010, : 203 - 207