Data-driven branching and selection for lot-sizing and scheduling problems with sequence-dependent setups and setup carryover

被引:12
|
作者
Zhang, Canrong [1 ,2 ]
Zhang, Dandan [1 ,2 ]
Wu, Tao [3 ]
机构
[1] Tsinghua Univ, Shenzhen Int Grad Sch, Div Logist & Transportat, Shenzhen 518055, Peoples R China
[2] Tsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R China
[3] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
基金
中国国家自然科学基金;
关键词
Lot-sizing; Parallel machine scheduling; Column generation; Branching and selection; Data-driven; PARALLEL MACHINES; MODELS; OPTIMIZATION; FORMULATIONS; ALGORITHMS; TIMES;
D O I
10.1016/j.cor.2021.105289
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The capacitated lot-sizing and machine scheduling problem with sequence-dependent setup time and setup carryover is a challenging problem with a wide application in industries. For the problem, two mixed integer programming models are proposed in order to explore their relative efficiencies in obtaining optimal solutions and linear programming relaxation lower bounds. Furthermore, due to the fact that the complicating constraints involve pairs of items (the sequence-dependent setups) and pairs of consecutive periods (the setup carryovers), making it difficult to decompose the problem per item or per period, we instead present a Dantzig-Wolfe decomposition reformulation per machine to improve lower bounds. We propose a branching and selection method to solve the problem, in which a collection of variables rather than individual variables are put into a data-driven process to generate useful information which is then adopted in the branching and selection process. Extensive numerical experiments show that the proposed algorithm can obtain numerically near-optimal solutions for small-scale problems and outperforms CPLEX and other heuristics in terms of both solution quality and runtime when the scale of instances increases. More experiments have been conducted to extract some insightful features related to the model and algorithm.
引用
收藏
页数:16
相关论文
共 50 条
  • [21] A two-stage heuristic for single machine capacitated lot-sizing and scheduling with sequence-dependent setup costs
    Shim, Ik-Soo
    Kim, Hyeok-Chol
    Doh, Hyoung-Ho
    Lee, Dong-Ho
    COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 61 (04) : 920 - 929
  • [22] New integer optimization models and an approximate dynamic programming algorithm for the lot-sizing and scheduling problem with sequence-dependent setups
    Lee, Younsoo
    Lee, Kyungsik
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 302 (01) : 230 - 243
  • [23] JOINT LOT SIZING AND SCHEDULING OF MULTIPLE ITEMS WITH SEQUENCE-DEPENDENT SETUP COSTS
    DILTS, DM
    RAMSING, KD
    DECISION SCIENCES, 1989, 20 (01) : 120 - 133
  • [24] A novel predictive-reactive scheduling method for parallel batch processor lot-sizing and scheduling with sequence-dependent setup time
    Qiu, Junhao
    Liu, Jianjun
    Peng, Chengfeng
    Chen, Qingxin
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 189
  • [25] A new algorithmic approach for capacitated lot-sizing problem in flow shops with sequence-dependent setups
    Mohammadi, M.
    Torabi, S. A.
    Ghomi, S. M. T. Fatemi
    Karimi, B.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (1-4): : 201 - 211
  • [26] A new algorithmic approach for capacitated lot-sizing problem in flow shops with sequence-dependent setups
    M. Mohammadi
    S. A. Torabi
    S. M. T. Fatemi Ghomi
    B. Karimi
    The International Journal of Advanced Manufacturing Technology, 2010, 49 : 201 - 211
  • [27] THE CYCLIC LOT SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUPS
    DOBSON, G
    OPERATIONS RESEARCH, 1992, 40 (04) : 736 - 749
  • [28] Capacitated lot-sizing with sequence dependent setup costs
    Haase, K
    OR SPEKTRUM, 1996, 18 (01) : 51 - 59
  • [29] Production lot sizing and scheduling with non-triangular sequence-dependent setup times
    Clark, Alistair
    Mahdieh, Masoumeh
    Rangel, Socorro
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (08) : 2490 - 2503
  • [30] Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities
    Haase, K
    Kimms, A
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 66 (02) : 159 - 169