On-line scheduling on a batch machine to minimize makespan with limited restarts

被引:16
|
作者
Fu, Ruyan [1 ]
Tian, Ji [1 ]
Yuan, Jinjiang [1 ]
He, Cheng [1 ,2 ]
机构
[1] Zhengzhou Univ, Dept Math, Zhengzhou 450052, Peoples R China
[2] Informat Engn Univ PLA, Inst Sci, Henan 450051, Peoples R China
基金
中国国家自然科学基金;
关键词
on-line scheduling; batch machine; restart; competitive ratio;
D O I
10.1016/j.orl.2007.07.001
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We study the on-line scheduling on an unbounded batch machine to minimize makespan. In this model, jobs arrive over time and batches are allowed limited restarts. Any batch that contains a job which has already been restarted once cannot be restarted any more. We provide a best possible on-line algorithm for the problem with a competitive ratio 3/2. (C) 2007 Published by Elsevier B.V.
引用
下载
收藏
页码:255 / 258
页数:4
相关论文
共 50 条
  • [41] On-Line Scheduling Algorithms for a Batch Machine with Finite Capacity
    Chung Keung Poon
    Wenci Yu
    Journal of Combinatorial Optimization, 2005, 9 : 167 - 186
  • [42] Family scheduling with batch availability in flow shops to minimize makespan
    Liji Shen
    Jatinder N. D. Gupta
    Journal of Scheduling, 2018, 21 : 235 - 249
  • [43] Single machine scheduling with job delivery to minimize makespan
    Lu, Lingfa
    Yuan, Jinjiang
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2008, 25 (01) : 1 - 10
  • [44] Scheduling deteriorating jobs to minimize the makespan on a single machine
    Chin-Chia Wu
    Yau-Ren Shiau
    Ling-Huei Lee
    Wen-Chiung Lee
    The International Journal of Advanced Manufacturing Technology, 2009, 44 : 1230 - 1236
  • [45] APPROXIMATE ALGORITHMS FOR UNRELATED MACHINE SCHEDULING TO MINIMIZE MAKESPAN
    Zhang, Xianzhao
    Xu, Dachuan
    Du, Donglei
    Miao, Cuixia
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2016, 12 (02) : 771 - 779
  • [46] Scheduling deteriorating jobs to minimize the makespan on a single machine
    Wu, Chin-Chia
    Shiau, Yau-Ren
    Lee, Ling-Huei
    Lee, Wen-Chiung
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 44 (11-12): : 1230 - 1236
  • [47] GRASP to minimize makespan for a capacitated batch-processing machine
    Damodaran, Purushothaman
    Ghrayeb, Omar
    Guttikonda, Mallika Chowdary
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 68 (1-4): : 407 - 414
  • [48] GRASP to minimize makespan for a capacitated batch-processing machine
    Purushothaman Damodaran
    Omar Ghrayeb
    Mallika Chowdary Guttikonda
    The International Journal of Advanced Manufacturing Technology, 2013, 68 : 407 - 414
  • [49] Two-agent scheduling on a bounded series-batch machine to minimize makespan and maximum cost
    He, Cheng
    Lin, Hao
    Han, Xinxin
    DISCRETE APPLIED MATHEMATICS, 2022, 322 : 94 - 101
  • [50] The unbounded single machine parallel batch scheduling problem with family jobs and release dates to minimize makespan
    Yuan, JJ
    Liu, ZH
    Ng, CT
    Cheng, TCE
    THEORETICAL COMPUTER SCIENCE, 2004, 320 (2-3) : 199 - 212