共 50 条
- [42] A new exact solution algorithm for the job shop problem with sequence-dependent setup times INTEGRATION OF AI AND OR TECHNIQUES IN CONSTRAINT PROGRAMMING FOR COMBINATORIAL OPTIMIZATION PROBLEMS, 2004, 3011 : 37 - 49
- [44] Job Shop Scheduling with Sequence-Dependent Setup Times Based on Constraint Programming Approach PROCEEDINGS OF 2012 3RD INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION (IEMI2012), 2013, : 835 - 841
- [46] A branch and bound method for the job-shop problem with sequence-dependent setup times Annals of Operations Research, 2008, 159 : 135 - 159
- [48] An approach for flexible job-shop scheduling with separable sequence-dependent setup time 2006 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-6, PROCEEDINGS, 2006, : 3727 - +