In pursuance of increasing power plants' competitiveness in energy market, these power plants need to embrace a proper operating and maintenance methodology in order to lessen the level of O & M (operation and maintenance) costs. Similar to this, Geothermal Power Plants ought to embrace as well the corresponding strategy, so that they can vie for their productivity and competitiveness. The prominence methodology needed should be able to achieve the equipment's availability at maximum level whilst attaining cost of maintenance at optimum level. Reliability is a parameter which is successfully used to serve as a warning signal for maintenance managers to respond to the lower level of availability. This paper demonstrates the application of Reliability Centred Maintenance (RCM) in Geothermal Power Plants. A case study of a geothermal power plant in Dieng - Central Java, Indonesia- operated by PT. Geo Dipa Energi was conducted. In this research, a framework for the implementation of RCM into Geothermal Power Plants was developed. The results include recommendations for 52 maintenance tasks to eliminate 36 malfunction of equipment that never happened, in the form of four lubricating task, four visual check task, 15 inspection tasks,18 scheduled restoration task, one scheduled discard task, and 10 no scheduled maintenance task..
引用
收藏
页码:934 / 938
页数:5
相关论文
共 50 条
  • [21] POWER-PLANT MAINTENANCE SCHEDULING - OPTIMIZING ECONOMICS AND RELIABILITY
    MUKERJI, R
    MERRILL, HM
    ERICKSON, BW
    PARKER, JH
    FRIEDMAN, RE
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1991, 6 (02) : 476 - 483
  • [22] Stochastic reliability simulation in power plant life and maintenance management
    Pakarinen, M
    BALTICA VI: LIFE MANAGEMENT AND MAINTENANCE FOR POWER PLANTS, VOL 1 AND 2, 2004, 233-234 : 79 - 88
  • [23] Reliability-Centred Asset Maintenance - A step towards enhanced reliability, availability, and profitability of wind power plants
    Besnard, Francois
    Fischer, Katharina
    Bertling, Lina
    2010 IEEE PES CONFERENCE ON INNOVATIVE SMART GRID TECHNOLOGIES EUROPE (ISGT EUROPE), 2010,
  • [24] The Maintenance Strategies Influence on the Reliability of Power Plant Generating Units
    Munteanu, Florin
    Nemes, Ciprian
    PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON OPTIMIZATION OF ELECTRICAL AND ELECTRONIC EQUIPMENT, VOLS 1-5, 2012, : 103 - 108
  • [25] VALVE OPERATION AND MAINTENANCE IS A KEY TO POWER-PLANT RELIABILITY
    JONES, CR
    POWER ENGINEERING, 1988, 92 (07) : 24 - 27
  • [26] Reliability-centred maintenance and dynamic maintenance safety - A winning team
    Little, J.E.
    Pulp and Paper Canada, 2005, 106 (11):
  • [27] Evaluating the level and nature of sustainable development for a geothermal power plant
    Phillips, Jason
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2010, 14 (08): : 2414 - 2425
  • [28] Development of Reliability Analysis Toolkit for Analysing Plant Maintenance Data
    Hussin, Hilmi
    Mokhtar, Ainul Akmar
    Muhammad, Masdi
    Karim, Mohd Amin Abdul
    ICPER 2014 - 4TH INTERNATIONAL CONFERENCE ON PRODUCTION, ENERGY AND RELIABILITY, 2014, 13
  • [29] RELIABILITY TEST OF A TCB PLANT AND ITS APPLICATION TO MAINTENANCE DEVELOPMENT
    ISASZEGI, J
    TIMAR, L
    HUNGARIAN JOURNAL OF INDUSTRIAL CHEMISTRY, 1979, 7 (03): : 323 - 340
  • [30] Effective operational excellence through Reliability Centred Maintenance
    Browne, Edwin R.
    Godkar, Ramesh
    International Journal of COMADEM, 2014, 17 (01): : 43 - 50