Reliability constrained multi-area adequacy planning using stochastic programming with sample-average approximations

被引:67
|
作者
Jirutitijaroen, Panida [1 ]
Singh, Chanan [2 ]
机构
[1] Natl Univ Singapore, Dept Elect & Comp Engn, Singapore 117576, Singapore
[2] Texas A&M Univ, Dept Elect & Comp Engn, College Stn, TX 77843 USA
关键词
Latin hypercube sampling; Monte Carlo sampling; multi-area power system; power system optimization; reliability; sample-average approximation; stochastic programming; two-stage recourse model;
D O I
10.1109/TPWRS.2008.919422
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper proposes a mixed-integer stochastic programming approach to the solution of generation and transmission line expansion planning problem including consideration of system reliability. Favorable system reliability and cost trade off is achieved by the optimal solution. The problem is formulated as a two-stage recourse model where random uncertainties in area generation, transmission lines, and area loads are considered. Reliability index used in this problem is expected cost of load loss as this index incorporates duration and magnitude of load loss. The objective is to minimize the expansion cost in the first stage and the operation and expected cost of load loss in the second stage. Due to exponentially large number of system states (scenarios) in large power systems, direct application of the L-shaped algorithm seems impractical. The expected cost of load loss is therefore approximated by considering only sampled scenarios and evaluated in the optimization. The estimated objective value is called sample-average approximation (SAA) of the actual expected value. In this paper, Monte Carlo sampling and Latin hypercube sampling techniques are implemented. Confidence intervals of upper and lower bound are discussed. The method is implemented to an actual 12-area power system for generation expansion planning and transmission line expansion planning.
引用
收藏
页码:504 / 513
页数:10
相关论文
共 46 条
  • [21] Supply chain planning using multi-stage stochastic programming
    Nagar, Lokesh
    Jain, Karuna
    [J]. SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2008, 13 (03) : 251 - 256
  • [22] A hybrid method for multi-area generation expansion using Tabu-search and dynamic programming
    Jirutitijaroen, Panida
    Singh, Chanan
    [J]. 2006 INTERNATIONAL CONFERENCE ON POWER SYSTEMS TECHNOLOGY: POWERCON, VOLS 1- 6, 2006, : 3133 - +
  • [23] Multi-area power systems economic dispatch using nonlinear convex network flow programming
    Zhu, JZ
    Momoh, JA
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2001, 59 (01) : 13 - 20
  • [24] CONSTRAINED ECONOMIC-DISPATCH OF MULTI-AREA SYSTEMS USING THE DANTZIG-WOLFE DECOMPOSITION PRINCIPLE
    ROMANO, R
    QUINTANA, VH
    LOPEZ, R
    VALADEZ, V
    [J]. IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1981, 100 (04): : 2127 - 2137
  • [25] A Multi-site Supply Chain Planning Using Multi-stage Stochastic Programming
    Felfel, Houssem
    Ayadi, Omar
    Masmoudi, Faouzi
    [J]. MULTIPHYSICS MODELLING AND SIMULATION FOR SYSTEMS DESIGN AND MONITORING, 2015, 2 : 289 - 298
  • [26] Power network-planning optimization considering average power not supplied reliability index: Modified by chance-constrained programming
    Ghayoor, Fatemeh
    Ghannadpour, Seyed Farid
    Zaboli, Aydin
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 164
  • [27] The multi-area systems reliability estimation using probabilistic load flow by Gramm-Charlier expansion
    Dondera, Daniel
    Popa, Razvan
    Velicescu, Corneliu
    [J]. EUROCON 2007: THE INTERNATIONAL CONFERENCE ON COMPUTER AS A TOOL, VOLS 1-6, 2007, : 2444 - 2448
  • [28] An accelerated Benders decomposition algorithm for stochastic power system expansion planning using sample average approximation
    Jenabi, M.
    Ghomi, S. M. T. Fatemi
    Torabi, S. A.
    Jalali, Moeen Sammak
    [J]. OPSEARCH, 2022, 59 (04) : 1304 - 1336
  • [29] An accelerated Benders decomposition algorithm for stochastic power system expansion planning using sample average approximation
    M. Jenabi
    S. M. T. Fatemi Ghomi
    S. A. Torabi
    Moeen Sammak Jalali
    [J]. OPSEARCH, 2022, 59 : 1304 - 1336
  • [30] Optimal Reactive Power Planning Using Two-Stage Stochastic Chance-Constrained Programming
    Lopez, Julio C.
    Mantovani, J. R. S.
    Contreras Sanz, Javier
    Munoz, Jose I.
    [J]. 2013 IEEE GRENOBLE POWERTECH (POWERTECH), 2013,