A social-behavioural approach to project work under uncertainty

被引:0
|
作者
Vaagen, Hajnalka [1 ,2 ]
Borgen, Eirik [3 ,4 ]
Hansson, Mathias
机构
[1] SINTEF Technol & Soc, Dept Appl Econ & Operat Res, Trondheim, Norway
[2] Molde Univ Coll, Molde, Norway
[3] SINTEF Raufoss Mfg, Trondheim, Norway
[4] Norwegian Business Sch, Dept Leadership & Org Behav, Oslo, Norway
来源
IFAC PAPERSONLINE | 2016年 / 49卷 / 12期
关键词
Social network; behavioural operations; project planning; responsiveness; uncertainty; shipbuilding; MANAGEMENT; KNOWLEDGE;
D O I
10.1016/j.ifacol.2016.07.596
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Engineering responsiveness is prerequisite to organisational success in dynamically changing engineer-to-order projects, such as specialised vessel construction. Creating flexibility by solving the true project plarming complexity is difficult due to the involved uncertainties and dynamics and classical models lack the flexibility necessary to adequately handle uncertainty. Model-based approaches are, therefore, frequently replaced by informal team processes and judgmental decision making, often demonstrating innovative solutions not visible within traditional approaches. We suggest that the core practice in handling uncertainty in technologically complex large projects is neither imposed by established hierarchies nor model-based decision support, but evolves from the lower level social behavioural structures, and extend the scope of research to include behavioural characteristics in social networks of project work. We demonstrate a way to study and better align the social capital to enable project responsiveness; by e.g. identifying symptoms of dysfunctional information transfer, and key influencers which will make a change project successful. The main purpose is to gain familiarity with the social phenomena involved, in order to formulate a more precise problem. (C) 2016, IFAC (Informational rederation of Automatic Control) Hosting Elsevier Ltd. All rights reserved.
引用
收藏
页码:203 / 208
页数:6
相关论文
共 50 条
  • [21] Genetic polymorphisms of the sortase A gene and social-behavioural factors associated with caries in children: a case-control study
    Yu, Li Xia
    Tao, Ye
    Qiu, Rong Min
    Zhou, Yan
    Zhi, Qing Hui
    Lin, Huan Cai
    BMC ORAL HEALTH, 2015, 15
  • [22] Balancing Project Schedule, Cost, and Value under Uncertainty: A Reinforcement Learning Approach
    Szwarcfiter, Claudio
    Herer, Yale T.
    Shtub, Avraham
    ALGORITHMS, 2023, 16 (08)
  • [23] Construction project proposal evaluation under uncertainty: A fuzzy-based approach
    Singh, Pushpinder
    Ruparathna, Rajeev
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2020, 47 (03) : 291 - 300
  • [24] A new approach for project control under uncertainty. Going back to the basics
    Acebes, Fernando
    Pajares, Javier
    Manuel Galan, Jose
    Lopez-Paredes, Adolfo
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (03) : 423 - 434
  • [25] School readiness of children with language impairment: predicting literacy skills from pre-literacy and social-behavioural dimensions
    Pentimonti, Jill M.
    Murphy, Kimberly A.
    Justice, Laura M.
    Logan, Jessica A. R.
    Kaderavek, Joan N.
    INTERNATIONAL JOURNAL OF LANGUAGE & COMMUNICATION DISORDERS, 2016, 51 (02) : 148 - 161
  • [27] TRAINING FOR UNCERTAINTY - A SOCIOLOGICAL APPROACH TO SOCIAL-WORK EDUCATION - HERAUD,B
    CHAIKLIN, H
    JOURNAL OF EDUCATION FOR SOCIAL WORK, 1982, 18 (02): : 122 - 124
  • [28] Flexible project management under uncertainty
    Narimatsu, K
    1998 JAPAN-U.S.A. SYMPOSIUM ON FLEXIBLE AUTOMATION - PROCEEDINGS, VOLS I AND II, 1998, : 907 - 910
  • [29] Project planning under temporal uncertainty
    Biundo, S
    Holzer, R
    Schattenberg, B
    Planning, Scheduling and Constraint Satisfaction: From Theory to Practice, 2005, 117 : 189 - 198
  • [30] Cognitive-behavioural social work in practice
    Banks, N
    BRITISH JOURNAL OF SOCIAL WORK, 1999, 29 (05): : 832 - 833