Successful Commissioning Process for a Design-Build Project

被引:0
|
作者
Mogannam, Bishara [1 ]
Flemming, Michael [2 ]
机构
[1] CTC Design, Santa Clara, CA 95054 USA
[2] Interface Engn, San Francisco, CA USA
关键词
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
One of the most important relationships in the commissioning process is between the commissioning agent, the owner and the engineer of record (EOR). A relationship that requires ongoing coordination with common goals defined at the beginning of the project. But what happens during design-build projects when the relationship between the EOR and contractors may result in different goals and can cause a conflict of interest? As an increasing number of projects move towards a design-build approach, the role of an independent commissioning agent grows to unbiased representative of the owner with the project best interest in mind. For the life of a project the commissioning agent's role can be more difficult and important when a project follows a design-build approach due to many factors including: An ongoing and sometimes unmonitored design process Value engineering with more focus on cost than owner's needs Design documents that match what's been installed instead of the other way around. Due to the nature of this process, the key to a successful commissioning project is early involvement of the commissioning agent during the document development, and clearly outlined commissioning process. The result is a successful project within the boundaries of the basis of design, on schedule and on budget. The intent of this article will be to provide a resource for all commissioning agents participating in a design-build project, and to offer guidelines to effectively navigate from design to construction and through occupancy. This article will compare and contrast the commissioning process under traditional design and design-build. It will provide an outline of means and methods for navigating the commissioning process with a design-build project allowing commissioning to be efficient and effective in meeting project energy goals and schedule.
引用
下载
收藏
页数:8
相关论文
共 50 条
  • [21] Key Challenges in Megabridge Design-Build Project Procurement
    Moran, Raymond M.
    Odeh, Ibrahim
    Ashuri, Baabak
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2022, 14 (01)
  • [22] Largest California highway design-build project opens
    不详
    CIVIL ENGINEERING, 1996, 66 (10): : 26 - &
  • [23] 'Design-build' method useful for refinery project execution
    Jones, James W.
    OIL & GAS JOURNAL, 2008, 106 (18) : 48 - 54
  • [24] Exploring the impact of project size on design-bid-build and design-build project delivery performance in highways
    Nguyen, Phuong H. D.
    Tran, Dai Q.
    Bypaneni, Sai P. K.
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2021, 39 (11) : 879 - 893
  • [25] Design transcends function in first GDOT design-build project in Atlanta
    McCraven, Sue
    PCI JOURNAL, 2008, 53 (01): : 58 - 82
  • [26] Contractors' influence within the design process of design-build projects
    Haroglu, H.
    Glass, J.
    Thorpe, T.
    Goodchild, C.
    CHALLENGES, OPPORTUNITIES AND SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2010, : 693 - 698
  • [27] DANGERS OF DESIGN-BUILD
    KULAK, AJ
    LANDSCAPE ARCHITECTURE, 1983, 73 (04): : 29 - 30
  • [28] DESIGN-BUILD LIABILITY
    COPLAN, N
    PROGRESSIVE ARCHITECTURE, 1987, 68 (05): : 73 - +
  • [29] A learning model for design-build project selection in the public sector
    Bastias, Alfonso
    Molenaar, Keith R.
    REVISTA INGENIERIA DE CONSTRUCCION, 2010, 25 (01): : 5 - 20
  • [30] Application of bamboo in a design-build course: Lianhuadang Farm project
    Jiao, Jian
    Tang, Peng
    FRONTIERS OF ARCHITECTURAL RESEARCH, 2019, 8 (04) : 549 - 563