A bicriteria approach to maximize the weighted number of just-in-time jobs and to minimize the total resource consumption cost in a two-machine flow-shop scheduling system

被引:23
|
作者
Shabtay, Dvir [1 ]
Bensoussan, Yaron [1 ]
Kaspi, Moshe [1 ]
机构
[1] Ben Gurion Univ Negev, Dept Ind Engn & Management, IL-84105 Beer Sheva, Israel
基金
以色列科学基金会;
关键词
Just-in-time scheduling; Flow shop; Controllable processing times; Resource allocation; Pseudo-polynomial time algorithm; FPTAS; CONTROLLABLE PROCESSING TIMES; SINGLE-MACHINE; SEQUENCING PROBLEMS; PARALLEL MACHINES; ALLOCATION; CONSTRAINTS; ALGORITHMS;
D O I
10.1016/j.ijpe.2011.09.011
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We analyze a two-machine flow-shop scheduling problem in which the job processing times are controllable by the allocation of resources to the job operations and the resources can be used in discrete quantities. We provide a bicriteria analysis of the problem where the first criterion is to maximize the weighted number of just-in-time jobs and the second criterion is to minimize the total resource consumption cost. We prove that although the problem is known to be NP-hard even for constant processing times, a pseudo-polynomial time algorithm for its solution exists. In addition, we show how the pseudo-polynomial time algorithm can be converted into a two-dimensional fully polynomial approximation scheme for finding an approximate Pareto solution. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:67 / 74
页数:8
相关论文
共 50 条
  • [31] Single machine scheduling with resource constraints: Equivalence to two-machine flow-shop scheduling for regular objectives
    Kovalev, Sergey
    Chalamon, Isabelle
    Becuwe, Audrey
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2024, 75 (07) : 1343 - 1346
  • [32] Two-machine flow shop total tardiness scheduling problem with deteriorating jobs
    Bank, M.
    Ghomi, S. M. T. Fatemi
    Jolai, F.
    Behnamian, J.
    APPLIED MATHEMATICAL MODELLING, 2012, 36 (11) : 5418 - 5426
  • [33] A bicriteria two-machine flow-shop serial-batching scheduling problem with bounded batch size
    Aloulou, M. A.
    Bouzaiene, A.
    Dridi, N.
    Vanderpooten, D.
    JOURNAL OF SCHEDULING, 2014, 17 (01) : 17 - 29
  • [34] Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan
    Allaoui, H.
    Lamouri, S.
    Artiba, A.
    Aghezzaf, E.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 112 (01) : 161 - 167
  • [35] Minimizing total completion time in a two-machine flow shop with deteriorating jobs
    Wang, Ji-Bo
    Ng, C. T. Daniel
    Cheng, T. C. E.
    Liu, Li-Li
    APPLIED MATHEMATICS AND COMPUTATION, 2006, 180 (01) : 185 - 193
  • [36] A note on "Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan"
    Hadda, Hatem
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 159 : 221 - 222
  • [37] Two-machine flow shop scheduling with a common due date to maximize total early work
    Chen, Xin
    Miao, Qian
    Lin, Bertrand M. T.
    Sterna, Malgorzata
    Blazewicz, Jacek
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 300 (02) : 504 - 511
  • [38] Single-machine scheduling to minimize total convex resource consumption with a constraint on total weighted flow time
    Wang, Ji-Bo
    Wang, Ming-Zheng
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (03) : 492 - 497
  • [39] Minimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deterioration
    Yang, Shu-Hui
    Wang, Ji-Bo
    APPLIED MATHEMATICS AND COMPUTATION, 2011, 217 (09) : 4819 - 4826
  • [40] Two-agent scheduling of unit processing time jobs to minimize total weighted completion time and total weighted number of tardy jobs
    Wan, Long
    Mei, Jiajie
    Du, Jiangze
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 290 (01) : 26 - 35