Construction Schedule Management System for Large-Scale Construction Projects Based on Multisensor Network

被引:0
|
作者
Meng, Fanmin [1 ]
Yu, Shaozhi [2 ]
Xue, Jianying [1 ]
机构
[1] North Univ China, Sch Sci, Taiyuan 030051, Shanxi, Peoples R China
[2] Huayuan Int Land Port Grp Co Ltd, Taiyuan 030021, Shanxi, Peoples R China
关键词
BIM; CHECKING;
D O I
10.1155/2022/3003552
中图分类号
Q [生物科学];
学科分类号
07 ; 0710 ; 09 ;
摘要
As an important task of construction project management, construction schedule management is related to the realization of project period, cost, quality, and other objectives. However, in actual construction, problems such as difficulties in plan implementation and management are often encountered, and schedule delays often occur. Moreover, with the increase in the scale and complexity of modern buildings, the management of construction schedules has brought about larger issues and higher requirements have been put forward for the management level of the construction schedule. The traditional timetable management and scheduling is not highly relevant to the project entity. There is no entity change, the project information loss is serious, the tracking and control of the construction timetable is not in place, there is fine management, and the construction timetable management cannot meet the needs of modern construction. In order to ensure the smooth implementation of projects and objectives, it is urgent to explore new management ideas and methods to promote the smooth progress of construction process management. BIM technology has the advantages of visibility, simulation, adjustment, optimization, and advanced data integration, which helps to make up for the shortcomings of previous schedule management and improve the level of construction schedule management. Based on the research situation of large-scale construction project monitoring system and the analysis of information fusion technology, this paper proposes a large-scale construction project monitoring system scheme based on multisensor network information fusion. Through the investigation of the monitoring content, the composition of the multisensor network is determined. This paper is applicable to large-scale construction projects. Through the research and design of hardware modules, software modules, and fusion algorithms, the data acquisition, transmission, calculation, and display functions of the monitoring system based on multisensor network information fusion are realized, which can effectively monitor the entire process of large-scale construction projects.
引用
收藏
页数:10
相关论文
共 50 条
  • [41] A Schedule Risk Assessment Model of Construction Projects Based on Bayesian Network
    Liu Zheng
    Ma Guofeng
    [J]. PROCEEDINGS OF THE 2011 INTERNATIONAL CONFERENCE ON ENGINEERING AND RISK MANAGEMENT, 2011, : 106 - 111
  • [42] Construction of a logistics information management system for large-scale groups based on enterprise resource planning
    Yang, Zhen
    [J]. AGRO FOOD INDUSTRY HI-TECH, 2017, 28 (01): : 1852 - 1856
  • [43] Construction of large-scale honeynet Based on Honeyd
    Wang, Jun
    Zeng, Jing
    [J]. CEIS 2011, 2011, 15
  • [44] Promoting large-scale construction enterprise management improvement by enterprise cultural construction
    Yao, Gui-Qing
    [J]. Journal of Railway Engineering Society, 2015, 32 (08) : 100 - 105
  • [45] Large-scale Construction Project Organization Management Mode in the Railway Construction Enterprise
    Ren Xu
    Hao Shengyue
    [J]. CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 2596 - 2600
  • [46] A change management system for construction construction projects
    Sun, M
    Fleming, A
    Senaratne, S
    Motawa, IA
    Yeoh, ML
    [J]. CONCURRENT ENGINEERING: THE WORLDWIDE ENGINEERING GRID, PROCEEDINGS, 2004, : 809 - 816
  • [47] Organizational Barriers to Productivity and Innovation in Large-Scale, U.S.-Based Photovoltaic System Construction Projects
    Yuventi, Jumie
    Levitt, Raymond
    Robertson, Hugh
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (10)
  • [48] Bi-stakeholder Conflict Resolution-Based Layout of Construction Temporary Facilities in Large-Scale Construction Projects
    Xiaoling Song
    Zhe Zhang
    Jiuping Xu
    Ziqiang Zeng
    Charles Shen
    Feniosky Peña-Mora
    [J]. International Journal of Civil Engineering, 2018, 16 : 941 - 964
  • [49] Bi-stakeholder Conflict Resolution-Based Layout of Construction Temporary Facilities in Large-Scale Construction Projects
    Song, Xiaoling
    Zhang, Zhe
    Xu, Jiuping
    Zeng, Ziqiang
    Shen, Charles
    Pea-Mora, Feniosky
    [J]. INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2018, 16 (8A) : 941 - 964
  • [50] PRODUCTION-DISTRIBUTION PLANNING OF CONSTRUCTION SUPPLY CHAIN MANAGEMENT UNDER FUZZY RANDOM ENVIRONMENT FOR LARGE-SCALE CONSTRUCTION PROJECTS
    Xu, Jiuping
    Wei, Pei
    [J]. JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2013, 9 (01) : 31 - 56