Strategic Assessment of Dam Overtopping Reliability Using a Stochastic Process Approach

被引:15
|
作者
Sharafati, Ahmad [1 ]
Yaseen, Zaher Mundher [2 ]
Pezeshki, Elnaz [3 ]
机构
[1] Islamic Azad Univ, Sci & Res Branch, Dept Civil Engn, Tehran, Iran
[2] Ton Duc Thang Univ, Fac Civil Engn, Sustainable Dev Civil Engn Res Grp, Ho Chi Minh City, Vietnam
[3] East Carolina Univ, Integrated Coastal Sci Program, Greenville, NC 27858 USA
关键词
Dam reliability; Uncertainty analysis; Dam overtopping; Monte Carlo; RISK-ASSESSMENT; HEC-HMS; PROBABILISTIC CONCEPTS; RESERVOIR; FLOOD; RUNOFF; RAINFALL; MODEL; UNCERTAINTY; FAILURE;
D O I
10.1061/(ASCE)HE.1943-5584.0001938
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Earth-fill dam overtopping could pose significant threats to public safety if the necessary reliability assessments are not taken into consideration in the design process. Dam overtopping is caused by several hydrometeorological random variables, including intensive rainfall, flood or flash flood, and wind coupled with waves. Because random variables are the main effective variables, a stochastic processes can be used to capture the leading failure factors. This study proposes a load-resistance-based approach to assess the reliability of Jamishan Dam, Iran, overtopping by considering several random variables simultaneously. Uncertainty sources such as (1) parameters of the hydrological model (e.g., loss, base flow, and unit hydrograph parameters), (2) hydraulic parameters (coefficient and length of spillway parameters), (3) initial reservoir water level, (4) wave height (e.g., wind setup and wave run-up parameters), and (5) rainfall parameters, are quantified using the Monte Carlo simulation (MCS) technique. Besides, the impact of stochastic sources and dam dimension design on overtopping reliability is considered through two indices, called reliability relative difference index (Rd) and reliability variation index (Rv). The uncertainty of hydrological parameters is quantified using the generalized likelihood uncertainty estimation (GLUE) method, which helps to extract their posterior probability distribution functions (PDFs). Reliability of dam overtopping has negligible sensitivity on the performance measures and behavioral threshold value of the GLUE approach. Results indicate that rainfall depth (Rd=2.04) is the most significant random variable affecting the overtopping reliability, with hydraulic random parameters (Rd=0.1) as the minimum level. Loss parameters (Rd=0.47) have the highest impact on overtopping reliability compared with other hydrological parameters. Overall, the significant of the stochastic sources such as meteorological parameters (e.g., rainfall depth, duration, and pattern), and hydrological parameters (e.g., loss parameters) on dam overtopping should be further studied to obtain reliable perspective for decision makers.
引用
收藏
页数:16
相关论文
共 50 条
  • [21] Systemic Estimation of Dam Overtopping Probability: Bayesian Networks Approach
    Wang, Fan
    Zhang, Qi-Ling
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2017, 23 (02)
  • [22] Estimation of flood induced overtopping reliability of dams on Tanyeri Dam case study
    Tanyeri Baraji örneginde barajlarin taskin nedeniyle üstten asilma güvenilirliginin belirlenmesi
    Çalamak, Melih (melih.calamak@tedu.edu.tr), 1600, Gazi Universitesi (32):
  • [23] Test Study on Overtopping Breaching Process of Earth Dam and Peak discharge
    Duan Wengang
    Zhang Hui
    Yang Jinbo
    PROCEEDINGS OF THE 35TH IAHR WORLD CONGRESS, VOLS III AND IV, 2013,
  • [24] Reliability Approach on Internal Erosion Risk Assessment of Earth Dam and Levee
    Lee, Sangho
    Lee, Samuel
    GEO-RISK 2017: GEOTECHNICAL RISK ASSESSMENT AND MANAGEMENT, 2017, (285): : 188 - 197
  • [25] Using soil-cement to construct an overtopping gravity dam
    Nix, Pete
    Riedy, Steven
    2017 ASDSO - Dam Safety, Conference Proceedings, 2017, : 951 - 970
  • [26] Dam overtopping risk using probabilistic concepts - Case study: The Meijaran Dam, Iran
    Goodarzi, Ehsan
    Shui, Lee Teang
    Ziaei, Mina
    AIN SHAMS ENGINEERING JOURNAL, 2013, 4 (02) : 185 - 197
  • [27] Risk assessment for dam failure using probability approach
    Khan, A
    Jamal, SQ
    APPLICATIONS OF STATISTICS AND PROBABILITY, VOLS 1 AND 2: CIVIL ENGINEERING RELIABILITY AND RISK ANALYSIS, 2000, : 363 - 366
  • [28] Stochastic boundary element computation of the reliability of gravity dam
    Zhang, M
    Wu, QG
    HYDROPOWER IN THE NEW MILLENNIUM, 2001, : 527 - 530
  • [29] An Approach to Reliability Assessment Under Degradation and Shock Process
    Wang, Zhonglai
    Huang, Hong-Zhong
    Li, Yanfeng
    Xiao, Ning-Cong
    IEEE TRANSACTIONS ON RELIABILITY, 2011, 60 (04) : 852 - 863
  • [30] Reliability Assessment of Production Process - Markov Modelling Approach
    Nowakowski, Tomasz
    Werbinska-Wojciechowska, Sylwia
    Chlebus, Maciej
    INTELLIGENT SYSTEMS IN PRODUCTION ENGINEERING AND MAINTENANCE (ISPEM 2017), 2018, 637 : 392 - 406