In a cap-and-trade system, a power plant operator can choose to operate while paying for the necessary emissions, allowances, retrofit emissions controls to the plant, or replace the unit with a new plant. Allowance prices are uncertain, as are the timing and stringency of requirements for control of mercury and carbon emissions. We model the evolution of allowance prices for SO2, NOx, Hg, and CO2 using geometric Brownian motion with drift, volatility, and jumps, and use an options-based analysis to find the value of the alternatives. In the absence of a carbon price, only if the owners have a planning horizon longer than 30 years would they replace a conventional coal-fired plant with a high-performance unit such as a supercritical plant, otherwise, they would install SO2 and NOx controls on the existing unit. An expectation that the CO2 price will reach $50/t in 2020 makes the installation of an IGCC with carbon capture and sequestration attractive today, even for planning horizons as short as 20 years. A carbon price below $40/t is unlikely to produce investments in carbon capture for electric power.
引用
收藏
页码:7980 / 7986
页数:7
相关论文
共 50 条
  • [1] Integration of Retrofitted Coal-fired Power Plant with CCS: Power De-rate Minimization
    An, Jinjoo
    Lee, Ung
    Jung, Jaeheum
    Han, Chonghun
    [J]. 12TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING (PSE) AND 25TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING (ESCAPE), PT A, 2015, 37 : 545 - 550
  • [2] Repowering a small coal-fired power plant
    Miell, Rick
    [J]. POWER ENGINEERING, 2007, 111 (11) : 24 - 24
  • [3] Court blocks coal-fired power plant
    不详
    [J]. CHEMICAL & ENGINEERING NEWS, 2008, 86 (27) : 19 - 19
  • [4] 1600 megawatt coal-fired power plant
    不详
    [J]. BAUINGENIEUR, 2009, 84 : A14 - A14
  • [5] Coal-fired power plant tour notes
    Yoshida, Yoshiaki
    [J]. Journal of the Institute of Electrical Engineers of Japan, 2023, 143 (01):
  • [6] Numerical investigation of 660 MW pulverized coal-fired supercritical power plant retrofitted to oxy-coal combustion
    Yadav, Sujeet
    Mondal, S. S.
    [J]. INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2021, 105
  • [7] Models for Coal Blending with Inventory in Coal-Fired Power Plant
    Zhao Jian
    Liu Shi-xin
    [J]. 2013 25TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2013, : 1790 - 1793
  • [8] Coal-fired power plant pollution in South Africa
    Makoni, Munyaradzi
    [J]. LANCET RESPIRATORY MEDICINE, 2023, 11 (10): : 866 - 866
  • [9] Thermoeconomic operation optimization of a coal-fired power plant
    Xiong, Jie
    Zhao, Haibo
    Zhang, Chao
    Zheng, Chuguang
    Luh, Peter B.
    [J]. ENERGY, 2012, 42 (01) : 486 - 496
  • [10] North Dakota coal-fired power plant planned
    不详
    [J]. MINING ENGINEERING, 2001, 53 (09) : 13 - 13