Stage-wise optimizing operating rules for flood control in a multi-purpose reservoir

被引:48
|
作者
Chou, Frederick N. -F. [1 ]
Wu, Chia-Wen [1 ]
机构
[1] Natl Cheng Kung Univ, Dept Hydraul & Ocean Engn, Taiwa, Miyagi, Japan
关键词
Multi-purpose reservoir; Flood control operation; Optimal release rules; BOBYQA; DISTRIBUTED HYDROLOGICAL MODEL; DECISION-SUPPORT-SYSTEM; MANAGEMENT; METHODOLOGY; ALGORITHM; RIVER;
D O I
10.1016/j.jhydrol.2014.11.073
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents a generic framework of release rules for reservoir flood control operation during three stages. In the stage prior to flood arrival, the rules indicate the timing and release discharge of pre-releasing reservoir storage to the initial level of flood control operation. In the stage preceding the flood peak, the rules prescribe the portion of inflow to be detained to mitigate downstream flooding, without allowing the water surface level of reservoir to exceed the acceptable safety level of surcharge. After the flood peak, the rules suggest the timing for stepwise reduction of the release flows and closing the gates of spillways and other outlets to achieve the normal level of conservation use. A simulation model is developed and linked with BOBYQA, an efficient optimization algorithm, to determine the optimal rule parameters in a stage-wise manner. The release rules of Shihmen Reservoir of Taiwan are established using inflow records of 59 historical typhoons and the probable maximum flood. The deviations from target levels at the end of different stages of all calibration events are minimized by the proposed method to improve the reliability of flood control operation. The optimized rules satisfy operational objectives including dam safety, flood mitigation, achieving sufficient end-of-operation storage for conservation purposes and smooth operation. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:245 / 260
页数:16
相关论文
共 50 条
  • [31] Multi-arm multi-stage designs with fixed stage-wise sample sizes
    Grayling, Michael
    Wason, James
    TRIALS, 2019, 20
  • [32] STAGE-WISE CONTROL OF HEPARIN PRODUCTION WITH EMPLOYMENT OF PAPER CHROMATOGRAPHY
    ALIEV, AM
    ALEKPERO.AF
    KHIMIKO-FARMATSEVTICHESKII ZHURNAL, 1970, 4 (02): : 48 - &
  • [33] Fuzzy logic model for multi-purpose multi-reservoir system
    Prasad, MY
    Mohan, S
    Artificial Intelligence Applications and Innovations II, 2005, 187 : 335 - 347
  • [34] Optimizing Joint Flood Control Operating Charts for Multi-reservoir System Based on Multi-group Piecewise Linear Function
    Chen, Lihua
    Yu, Jing
    Teng, Jin
    Chen, Hang
    Teng, Xiang
    Li, Xuefang
    WATER RESOURCES MANAGEMENT, 2022, 36 (09) : 3305 - 3325
  • [36] Xiaolangdi Multi-Purpose Dam Project and Its Function for the Downstream Flood Control of the Yellow River
    Zhai Jiarui
    Sun Feng
    Zhao Xianrong
    PROCEEDINGS OF THE 1ST INTERNATIONAL YELLOW RIVER FORUM ON RIVER BASIN MANAGEMENT, VOL III, 2003, : 160 - 163
  • [37] Design rules for tolerance-insensitive and multi-purpose fixtures
    Zhuang, Y
    Goldberg, K
    8TH INTERNATIONAL CONFERENCE ON ADVANCED ROBOTICS, 1997 PROCEEDINGS - ICAR'97, 1997, : 681 - 686
  • [38] Acoustic Echo Control with Frequency-Domain Stage-Wise Regression
    Jiang, Kaiyu
    Wu, Chao
    Guo, Yanmeng
    Fu, Qiang
    Yan, Yonghong
    IEEE SIGNAL PROCESSING LETTERS, 2014, 21 (10) : 1265 - 1269
  • [39] Development of Reservoir Operation Rules for Sustainable Water Supply Considering Climate Change on Multi-Purpose Dams in Korea
    Jang, Suhyung
    Kim, Jung Min
    Lim, Kwang Suop
    Ryoo, Kyongsik
    Park, Jin Hyeog
    WORLD ENVIRONMENTAL AND WATER RESOURCES CONGRESS 2017: GROUNDWATER, SUSTAINABILITY, AND HYDRO-CLIMATE/CLIMATE CHANGE, 2017, : 453 - 460
  • [40] A Stage-wise Stationary Monocular Visual Control Method for Assembly Robot
    Hu, Xiaoping
    Xiao, Dongming
    RECENT ADVANCES IN ELECTRICAL & ELECTRONIC ENGINEERING, 2018, 11 (03) : 274 - 279