The Excavation Simulation of Underground Railway Station Engineering with ABAQUS

被引:0
|
作者
Kang, Fu-zhong [1 ]
He, Shao-hui [1 ]
Yang, Jia-xuan [1 ]
机构
[1] Beijing Jiaotong Univ, Dept Tunnel & Underground, Beijing 100044, Peoples R China
来源
ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, VOL 1: ENGINEERING COMPUTATION AND FINITE ELEMENT ANALYSIS | 2010年
关键词
ABAQUS; underground railway station engineering; excavation; simulation;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Based on the new Beijing-Zhangjiakou Railway underground stations Badaling section of triune-arch structure, the most shallow beried-depth of station vault is 75m, the span up to 43.83m, height of 21.73m, cross-section area of 857.1026 m(2), such a large span structure in the China is the first case, the similar project in foreign countries are extremely rare, rare in the world. In order to explore the stability of surrounding rock may occur in the construction process, it is necessary that the numerical simulation analysis for rock status before construction, the paper use the advanced large-scale non-linear finite element software ABAQUS for underground railway station engineering excavation process simulation analysis,In the excavation process, using double rock column excavation methods, supporting rapid method, simulation results show that the rock stress did not exceed its yield stress, the largest settlements of vault were reasonable within the limits prescribed, the double rock column supporting method is a good excavation role for the large span surrounding rock excavation,and indicating the design is reasonable, simulation analysis is essential to the application of underground railway station engineering.
引用
收藏
页码:163 / 167
页数:5
相关论文
共 50 条
  • [21] Simulation of the Interaction of Railway Station and Harbor
    Mihailovs, Fjodors
    Sansyzbajeva, Zura
    Mezitis, Mareks
    ICTE 2016, 2017, 104 : 222 - 226
  • [22] Stepwise excavation process of underground caverns of hydropower station using DDA
    Fu, Xiao-Dong
    Sheng, Qian
    Zhang, Yong-Hui
    Yantu Lixue/Rock and Soil Mechanics, 2013, 34 (02): : 568 - 574
  • [23] Research on excavation damage zone of underground powerhouse of Dagangshan hydropower station
    Zhu, Zeqi
    Sheng, Qian
    Zhang, Yonghui
    Li, Yangfan
    Zhu, Z. (zqzhu@whrsm.ac.cn), 1600, Academia Sinica (32): : 734 - 739
  • [24] Finite element analysis of the excavation of the new Garibaldi station of Napoli underground
    De Sanctis, L.
    Mandolini, A.
    Viggiani, G. M. B.
    NUMERICAL MODELLING OF CONSTRUCTION PROCESSES IN GEOTECHNICAL ENGINEERING FOR URBAN ENVIRONMENT, 2006, : 57 - +
  • [25] Stepwise excavation process of underground caverns of hydropower station using DDA
    Fu Xiao-dong
    Sheng Qian
    Zhang Yong-hui
    ROCK AND SOIL MECHANICS, 2013, 34 (02) : 568 - 574
  • [26] Excavation and monitoring of the main tailrace tunnels of the Xiangjiaba underground power station
    Yi, Z.
    ROCK MECHANICS FOR RESOURCES, ENERGY AND ENVIRONMENT, 2013, : 847 - 851
  • [27] Simulation of Interval Excavation of Marble Slope by ABAQUS Finite Element Method
    Zhang, Qingli
    Wang, Kangming
    Jiao, Changqing
    Zhu, Wen
    Wang, Jiayu
    Ge, Junyuan
    CICTP 2020: ADVANCED TRANSPORTATION TECHNOLOGIES AND DEVELOPMENT-ENHANCING CONNECTIONS, 2020, : 957 - 966
  • [28] LARGE-SCALE UNDERPINNING FOR AN UNDERGROUND URBAN RAILWAY STATION
    MASUDA, Y
    MINOSHIMA, T
    MAKINO, H
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1992, 7 (02) : 133 - 140
  • [29] Plugging of fastening space of 'Dinamo' station of the Ekaterinburg underground railway
    Stadukhin, V.N.
    Lushnikova, O.Yu.
    Izvestiya Vysshikh Uchebnykh Zavedenii, Gornyi Zhurnal, 1992, (09):
  • [30] Summary of numerical simulation of fire in underground railway
    Lu, Jia-Hua
    Zhang, Zhi-Ying
    Shanghai Ligong Daxue Xuebao/Journal of University of Shanghai for Science and Technology, 2008, 30 (05): : 501 - 506