An expert technique for optimization of underground mine support system

被引:0
|
作者
Kashyap, Sudhir Kumar [1 ]
Tanweer, Md. [1 ]
Sinha, Amalendu [1 ]
Parhi, Dayal Ramakrishna [2 ]
机构
[1] CSIR, Cent Inst Min & Fuel Res, Dhanbad, Jharkhand, India
[2] Natl Inst Technol, Rourkela, Orissa, India
关键词
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Exploitation of coal with safe roof control in India has been a challenging problem for many years. In terms of the method of coal excavation, the share of opencast mining, which was as low as 14% in 1951, increased to current high level of above 80%, whereas the share of underground mining declined from 77% in 1971, to its current 20%. Even though, we can't ignore the underground mining due to its superior quality of coal as well as for societal reasons i.e. rehabilitation of people in mining areas. According to statistics of accident data fall of roof/sides is one of the major causes of underground mine accidents. In many cases, our experiences and knowledge about soil and rock behavior still falls short of being able to predict how the ground will behave. Presently, empirical relations to design are widely used in estimating mine support parameters. Under these circumstances, expert technique plays an important role, and such accidents can be minimized with collection and optimization of parametric data and analysis using the fuzzy-neuro technique of artificial intelligence. The availability of data and knowledge are two important considerations in implementing such techniques i.e expert technique. In this paper we have discussed the different techniques of Artificial Intelligence (AI) that are adopted here include Artificial Neural Network (ANN), Fuzzy Logic Technique, and its hybridization, Fuzzy-Neuro Technique. Fuzzy-Neuro technique has come out with comparatively better solution to approximate the amount of pre-load causing roof fall which is applied to the standing props to support the roof during excavation. We have taken 12 input parameters of mining operation. Output obtained with fuzzy technique with 5 triangular membership function they were again trained with neural network using sigmoidal function. After having trained the network actual underground excavation parameters data were simulated through MATLAB to find the final output i. e pre-load to be applied on props so as not to dislodge during blasting. It was found satisfactory. Fuzzy-Neuro technique has better performance over individual fuzzy logic or neural networks technique.
引用
收藏
页码:561 / 565
页数:5
相关论文
共 50 条
  • [31] MANIPULATORS FOR TUNNEL AND MINE ROADWAY SUPPORT IN UNDERGROUND OPERATION
    WANNER, MC
    HOFMANN, R
    ROBOTERSYSTEME, 1987, 3 (04): : 237 - 245
  • [32] Optimization of underground mine development system using fuzzy shortest path length algorithm
    Gligoric, Zoran Milan
    Beljic, Cedomir Rajko
    Jovanovic, Sasa Miladin
    Cvijovic, Cedomir Miodrag
    JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2014, 37 (08) : 965 - 982
  • [33] Expert system for mine roof analysis
    Somerville, Paul
    Journal of the Institution of Engineers, Australia, 1988, 60 (15):
  • [34] Stopes stability in underground mine and its control technique
    Xu, Wenbin
    Song, Weidong
    Cao, Shuai
    Jiang, Guojian
    Wu, Feng
    Jiang, Lei
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2015, 32 (04): : 658 - 664
  • [35] Expert system for protection of mine flood
    Zhang, Wenquan
    Liu, Weitao
    Li, Jiaxiang
    Zhang, Hongri
    Jisuanji Gongcheng/Computer Engineering, 2000, 26 (05): : 83 - 84
  • [36] Expert decision support system for ore-bin optimization blending
    Beijing Keji Daxue Xuebao, 5 (503-507):
  • [37] Optimization of underground mine access layout and production scheduling
    Hou, Jie
    Li, Guoqing
    Hu, Nailian
    GOSPODARKA SUROWCAMI MINERALNYMI-MINERAL RESOURCES MANAGEMENT, 2020, 36 (02): : 87 - 107
  • [38] Arrangement Method of Offshore Topside Based on an Expert System and Optimization Technique
    Kim, Sung-Kyoon
    Roh, Myung-Il
    Kim, Ki-Su
    JOURNAL OF OFFSHORE MECHANICS AND ARCTIC ENGINEERING-TRANSACTIONS OF THE ASME, 2017, 139 (02):
  • [39] Optimization of shuttle car utilization at an underground coal mine
    Segopolo, P. R.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2015, 115 (04) : 285 - 296
  • [40] ENGINEERING OF A DECISION-SUPPORT SYSTEM FOR UNDERGROUND COAL-MINE PLANNING AND PRODUCTION SCHEDULING
    LI, ZX
    PRODUCTION PLANNING & CONTROL, 1994, 5 (01) : 103 - 106